    11= LhARA radiobiology; meeting: 20Feb25; 14:00 GMT =
    22
    3 **ZOOM:** https://cern.zoom.us/j/61351195916?pwd=T0acw3Tid5bW7EQdGMmefUj2XIr7TY.1
     3**Present:** K.Long, A.Fernandez Rodriguez, C.Hill, E.Melia, N.Dover, M.Hill, R.Amos
    44
    55== Notes ==
     
    1010
    11112. //PoPLaR simulation in Topaz: // A.Fernandez-Rodgriguez
     12 - Gaussian source at 10 MeV.  Simulation of energy deposition using TOPAZ presented.
     13 - Suggestions: plot dose, LET, flatness.
     14 - **Actions:**
     15  - **AFR, KL, CD:** Check model and mapping optics code to TOPAZ.
     16  - **CH:** Send step file of set-up to AFR
    1217
    13183. //Field mapping of PMQs: // HO/BS
     19 - No update this week.
    1420
    15214. //Mechanical design update: // CH
     22 - CH closed loop with on design with Strathclyde.  CH waiting for some feedback.
    1623
    17245. //Bioprep: // EM/MH
     25 - Optimisation working; aim to do 10 MeV run on cyclotron planned for 13Mar25.
     26 - Glass rings now on order.
    1827
    19286. DoNM
     29 - 27Feb25, then fortnightly.
    2030
    21317. AoB
    22 
     32 - None.