LhARA radiobiology; meeting: 13Mar25; 14:00 GMT
Present: M.Hill, J.Parsons, R.Gray, K.Long, R.Razak, C.Whyte, C.Palmer, B.Sheppard.
Notes
- Field mapping, preparation of PMQs: HO/BS
- Mapping done; needing now to document the measurements. Individual map probe points will be available. A grid field map can be provided, or, an interpolated map, analytical form etc.
- Timeline: Still aiming for June/July.
Actions:- RR/KL: Liaise with Will Shields and send to HO request for format of field map, e.g. B on grid with 0.5 mm pitch as starting point.
- Mechanical design update: CH
- Design of stands, kinematic mounts, stay-clear PTFE blocks advanced. Some details to be refined, then manufacture of plates can begin.
- Note to continue to assembly in DL; discuss shipping timescale when orders for stages placed.
- KL: ask C. Dyson to present error study at CM.
- Bioprep: EM/MH
- Carousel design updated; disc is larger and allows additional samples to be supported.
- E. Melia is doing He ion irradiations at the moment using glass rings etc; investigations of benefit to SCAPA.
- DoNM
- 27Mar25
- AoB
- None.
Summary of actions
- RR/KL: Liaise with Will Shields and send to HO request for format of field map, e.g. B on grid with 0.5 mm pitch as starting point.
- KL: ask C. Dyson to present error study at CM.
Last modified
3 weeks ago
Last modified on Mar 13, 2025, 3:41:06 PM
Note:
See TracWiki
for help on using the wiki.