Changes between Version 1 and Version 2 of Research/LhARA/RadiationBiology/Meetings/2025-03-13
- Timestamp:
- Mar 13, 2025, 3:41:06 PM (3 weeks ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/RadiationBiology/Meetings/2025-03-13
v1 v2 1 1 = LhARA radiobiology; meeting: 13Mar25; 14:00 GMT = 2 2 3 ** ZOOM:** https://cern.zoom.us/j/61351195916?pwd=T0acw3Tid5bW7EQdGMmefUj2XIr7TY.13 **Present:** M.Hill, J.Parsons, R.Gray, K.Long, R.Razak, C.Whyte, C.Palmer, B.Sheppard. 4 4 5 5 == Notes == … … 7 7 1. //[wiki:Research/LhARA/RadiationBiology/Meetings/2025-02-20 Minutes and actions]: // 8 8 9 2. //Field mapping, preparation of PMQs: // HO/BS 9 2. //Field mapping, preparation of PMQs: // HO/BS 10 * Mapping done; needing now to document the measurements. Individual map probe points will be available. A grid field map can be provided, or, an interpolated map, analytical form etc. 11 * Timeline: Still aiming for June/July. \\ 12 **Actions:** 13 - **RR/KL:** Liaise with Will Shields and send to HO request for format of field map, e.g. B on grid with 0.5 mm pitch as starting point. 10 14 11 15 3. //Mechanical design update: // CH 16 * Design of stands, kinematic mounts, stay-clear PTFE blocks advanced. Some details to be refined, then manufacture of plates can begin. 17 * Note to continue to assembly in DL; discuss shipping timescale when orders for stages placed. 18 * **KL**: ask C. Dyson to present error study at CM. 12 19 13 20 4. //Bioprep: // EM/MH 21 * Carousel design updated; disc is larger and allows additional samples to be supported. 22 * E. Melia is doing He ion irradiations at the moment using glass rings etc; investigations of benefit to SCAPA. 14 23 15 24 5. DoNM … … 17 26 18 27 6. AoB 28 - None. 29 30 === Summary of actions === 31 - **RR/KL:** Liaise with Will Shields and send to HO request for format of field map, e.g. B on grid with 0.5 mm pitch as starting point. 32 * **KL**: ask C. Dyson to present error study at CM. 33 19 34 20 35 ----