| 1 | = LhARA radiobiology; meeting: 12Jun25; 14:00 BST = |
| 2 | |
| 3 | **Present:** CW, RW, RG, HO, CP, EM, JMcG, AFR, CD |
| 4 | |
| 5 | == Notes == |
| 6 | |
| 7 | 1. //[wiki:Research/LhARA/RadiationBiology/Meetings/2025-06-25 Minutes and actions]: // |
| 8 | |
| 9 | |
| 10 | 2. //Strathclyde Updates: // RG, RW, CW \\ |
| 11 | - Laser damage and beamtime: |
| 12 | - No major update. |
| 13 | - Still on for July run. |
| 14 | - Characterising the source to begin ~the week of the 14Jul |
| 15 | - Quad alignment and set up to be from 22Jul - 25Jul (21Jul is a bank holiday) |
| 16 | - Include cell sample for this run. |
| 17 | - Funding can extend until end of the financial year. |
| 18 | - Need to change the times of no-cost extensions (Emma to chase Tony about this). |
| 19 | - Bio phase to occur after September |
| 20 | |
| 21 | - Bio-safety cabinets |
| 22 | - Fixed! |
| 23 | - Recalibration to be completed in the next week |
| 24 | |
| 25 | - Waste and plastic consumables: |
| 26 | - Plan confirmed to use the autoclave in the Wolfson building. |
| 27 | - Need to train someone to carry the waste over. |
| 28 | - Marie Boyd is the back up. |
| 29 | - No update from Jason as off, but had been contacted by Marie. |
| 30 | - RCF stack fiduciary: |
| 31 | - Larger stack cut and notched |
| 32 | - Smaller stack more tricky. |
| 33 | - Can send to Rutherford for laser cutting |
| 34 | |
| 35 | 3. //Field mapping, preparation of PMQs: // HO/BS \\ |
| 36 | - Everything delivered or on delivery to Strathclyde. |
| 37 | - Expected by Monday (30Jun) |
| 38 | - Marked with a sharpie to indicate which way is forward. |
| 39 | - F quad has the lettering the right way around when placed correctly in beamline. |
| 40 | |
| 41 | |
| 42 | 4. // PMQ Positioning/Beam optimisation: // CD, RG, JMcG \\ |
| 43 | - Tony produced simulations with an average of 5.6KeV/um |
| 44 | - Previous simulations of 10MeV had shown an average of 4.8KeV/um |
| 45 | - Waiting for overlay from Tony to better understand distribution of LET |
| 46 | |
| 47 | |
| 48 | 5. //Simulation update: // KL, CD \\ |
| 49 | - G4 simulation of RCF stacks complete. |
| 50 | - Verified with SRIM and in comparison with LLO. |
| 51 | - Does not show the splitting effect that was hoped for |
| 52 | - Further verification with TOPAS simulating an RCF stacks |
| 53 | |
| 54 | 6. //Bioprep: // EM/MH \\ |
| 55 | - Cultures appeared to have survived. |
| 56 | - Results will be ready before the next meeting |
| 57 | |
| 58 | |
| 59 | 9. DoNM |
| 60 | - 10Jul25 14:00 **BST** |
| 61 | |
| 62 | 10. AoB \\ |
| 63 | - Ross' last meeting :( |
| 64 | |
| 65 | === Summary of actions === |
| 66 | - All the elements for the beamline are now in place |
| 67 | - **TP (and others?):** Chase up no-cost extensions |
| 68 | - **RW:** Cut and notch smaller RCF stack |
| 69 | - **TP:** Overlay previous LET distribution on newer |
| 70 | - **CD/AFR:** Verify G4 RCF stack |
| 71 | |
| 72 | |
| 73 | |
| 74 | |
| 75 | ---- |