Changes between Initial Version and Version 1 of Research/LhARA/RadiationBiology/Meetings/2025-06-26


Ignore:
Timestamp:
Jun 26, 2025, 3:31:09 PM (28 hours ago)
Author:
ccd24
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/RadiationBiology/Meetings/2025-06-26

    v1 v1  
     1= LhARA radiobiology; meeting: 12Jun25; 14:00 BST =
     2
     3**Present:** CW, RW, RG, HO, CP, EM, JMcG, AFR, CD
     4
     5== Notes ==
     6
     71. //[wiki:Research/LhARA/RadiationBiology/Meetings/2025-06-25 Minutes and actions]: //
     8
     9
     102. //Strathclyde Updates: // RG, RW, CW \\
     11- Laser damage and beamtime:
     12  - No major update.
     13- Still on for July run.
     14  - Characterising the source to begin ~the week of the 14Jul
     15  - Quad alignment and set up to be from 22Jul - 25Jul (21Jul is a bank holiday)
     16   - Include cell sample for this run.
     17  - Funding can extend until end of the financial year.
     18   - Need to change the times of no-cost extensions (Emma to chase Tony about this).
     19  - Bio phase to occur after September
     20
     21 - Bio-safety cabinets
     22  - Fixed!
     23  - Recalibration to be completed in the next week
     24
     25 - Waste and plastic consumables:
     26  - Plan confirmed to use the autoclave in the Wolfson building.
     27   - Need to train someone to carry the waste over.
     28   - Marie Boyd is the back up.
     29  - No update from Jason as off, but had been contacted by Marie.
     30 - RCF stack fiduciary:
     31  - Larger stack cut and notched
     32  - Smaller stack more tricky.
     33  - Can send to Rutherford for laser cutting
     34
     353. //Field mapping, preparation of PMQs: // HO/BS \\
     36 - Everything delivered or on delivery to Strathclyde.
     37 - Expected by Monday (30Jun)
     38 - Marked with a sharpie to indicate which way is forward.
     39  - F quad has the lettering the right way around when placed correctly in beamline.
     40
     41
     424. // PMQ Positioning/Beam optimisation: // CD, RG, JMcG \\
     43 - Tony produced simulations with an average of 5.6KeV/um
     44 - Previous simulations of 10MeV had shown an average of 4.8KeV/um
     45 - Waiting for overlay from Tony to better understand distribution of LET
     46
     47
     485. //Simulation update: // KL, CD \\
     49 - G4 simulation of RCF stacks complete.
     50 - Verified with SRIM and in comparison with LLO.
     51 - Does not show the splitting effect that was hoped for
     52 - Further verification with TOPAS simulating an RCF stacks
     53
     546. //Bioprep: // EM/MH \\
     55 - Cultures appeared to have survived.
     56 - Results will be ready before the next meeting
     57
     58
     599. DoNM
     60 - 10Jul25 14:00 **BST**
     61
     6210. AoB \\
     63 - Ross' last meeting :(
     64
     65=== Summary of actions ===
     66 - All the elements for the beamline are now in place
     67 - **TP (and others?):** Chase up no-cost extensions
     68 - **RW:** Cut and notch smaller RCF stack
     69 - **TP:** Overlay previous LET distribution on newer
     70 - **CD/AFR:** Verify G4 RCF stack
     71
     72
     73
     74
     75----