LhARA radiobiology; meeting: 26Jun25; 14:00 BST

Present: CW, RW, RG, HO, CP, EM, JMcG, AFR, CD

Notes

  1. Minutes and actions:
    • CW: Check on exhausts and talk to the "owner" of the backup cabinet
      • DONE
    • BT/RW: Send Calvin the proton energy spectrum.
      • STANDS
    • JP: Talk to Fisher and get a plan of action for the order and delivery of consumables to Strathclyde
      • STANDS
      CW: Speak to autoclave facility for bio waste disposal.
      • DONE
  1. Strathclyde Updates: RG, RW, CW
  • Laser damage and beamtime:
    • No major update.
  • Still on for July run.
    • Characterising the source to begin ~the week of the 14Jul
    • Quad alignment and set up to be from 22Jul - 25Jul (21Jul is a bank holiday)
      • Include cell sample for this run.
    • Funding can extend until end of the financial year.
      • Need to change the times of no-cost extensions (Emma to chase Tony about this).
    • Bio phase to occur after September
  • Bio-safety cabinets
    • Fixed!
    • Recalibration to be completed in the next week
  • Waste and plastic consumables:
    • Plan confirmed to use the autoclave in the Wolfson building.
      • Need to train someone to carry the waste over.
      • Marie Boyd is the back up.
    • No update from Jason as off, but had been contacted by Marie.
  • RCF stack fiduciary:
    • Larger stack cut and notched
    • Smaller stack more tricky.
    • Can send to Rutherford for laser cutting
  1. Field mapping, preparation of PMQs: HO/BS
    • Everything delivered or on delivery to Strathclyde.
    • Expected by Monday (30Jun)
    • Marked with a sharpie to indicate which way is forward.
      • F quad has the lettering the right way around when placed correctly in beamline.
  1. PMQ Positioning/Beam optimisation: CD, RG, JMcG
    • Tony produced simulations with an average of 5.6KeV/um
    • Previous simulations of 10MeV had shown an average of 4.8KeV/um
    • Waiting for overlay from Tony to better understand distribution of LET
  1. Simulation update: KL, CD
    • G4 simulation of RCF stacks complete.
    • Verified with SRIM and in comparison with LLO.
    • Does not show the splitting effect that was hoped for
    • Further verification with TOPAS simulating an RCF stacks
  1. Bioprep: EM/MH
    • Cultures appeared to have survived.
    • Results will be ready before the next meeting
  1. DoNM
    • 10Jul25 14:00 BST
  1. AoB
    • Ross' last meeting :(

Summary of actions

  • All the elements for the beamline are now in place
  • TP (and others?): Chase up no-cost extensions
  • RW: Cut and notch smaller RCF stack
  • TP: Overlay previous LET distribution on newer
  • CD/AFR: Verify G4 RCF stack