    11= LhARA radiobiology; meeting: 14Jul25; 14:00 BST =
    22
    3 **Present:** CW, RW, CP, EM, JMcG, AFR, CD, KL, DO
     3**Present:** CW, RW, CP, EM, JMcG, AFR, CD, KL, DA
    44
    55== Notes ==
    66
    771. //[wiki:Research/LhARA/RadiationBiology/Meetings/2025-06-26 Minutes and actions]: //
    8 
    98   - JP: Talk to Fisher and get a plan of action for the order and delivery of consumables to Strathclyde
    109    - **STANDS**
     
    1312
    14132. //Strathclyde Updates: // RW, CW \\
    15 - Laser damage and beamtime:
    16  - Damage also includes a vacuum pipe that needs fixing, defines a new schedule
    17  - New Schedule:
    18   - Week 1: Get back to where we were a month ago with correct laser delivery to the target.
    19   - Week 2: Re-establish and troubleshoot proton generation.
    20   - Week 3: Work with the quads and some diagnostic testing in the PoPLaR configuration.
    21    - Opportunity for a full bio walkthrough.
    22    - Double check the autoclave waste
    23    - Highly dependent on week 1 and week 2
    24 
     14 - Laser damage and beamtime:
     15  - Damage also includes a vacuum pipe that needs fixing, defines a new schedule
     16  - New Schedule:
     17   - Week 1: Get back to where we were a month ago with correct laser delivery to the target.
     18   - Week 2: Re-establish and troubleshoot proton generation.
     19   - Week 3: Work with the quads and some diagnostic testing in the PoPLaR configuration.
     20    - Opportunity for a full bio walkthrough.
     21    - Double check the autoclave waste
     22    - Highly dependent on week 1 and week 2
    2523 - Bio-safety cabinets:
    2624  - Recalibration still required and unsure of schedule
    27 
    2825 - RCF stack fiduciary:
    2926  - Smaller stack proving to be tricky
     
    3229  - Aligned with a cross-hair on carousel and a laser along the beam axis
    3330
    34 6. //Bioprep: // EM/MH \\
     313. //Bioprep: // EM/MH \\
    3532 - IF needs staining from the last experiments (14 vs 28 MeV)
    3633 - Issue with Mylar remains - colony survival too variable to be reliable
     
    3936 - To do - stain, image and analyse IF on Mylar
    4037
    41 7. DoNM
     384. DoNM
    4239 - 22Jul25 14:00 **BST** (After Work Package Manager meeting)
    4340 - Zoom Link: ​https://strath.zoom.us/j/81329354716
     
    4542 - Password: 206483
    4643
    47 8. AoB \\
     445. AoB \\
    4845 - Present work to LhARA fortnightly tomorrow
    4946  - CD: Updated SCAPA schedule