Changes between Version 1 and Version 2 of Research/LhARA/RadiationBiology/Meetings/2025-10-02
- Timestamp:
- Sep 29, 2025, 10:54:40 AM (8 days ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/RadiationBiology/Meetings/2025-10-02
v1 v2 1 = LhARA radiobiology; meeting: 21Aug25; 14:00 BST =1 = LhARA radiobiology; meeting: 02Oct25; 14:00 BST = 2 2 3 3 **ZOOM:** https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1 … … 30 30 - Install cell rotation mount 31 31 - Expected proton dose 32 33 34 3. Simulation CD, DA, AFr: \\ 35 - Results of an Au foil in the beamline 36 - Further discussion of uniformity? 37 38 4. BioPrep EM, JP: \\ 39 - Fix dates for dry-run 40 - Propose dates for proper run 32 41 - Discussion of the irradiation shot plan 33 42 34 35 3. Simulation CD, DA, AF: \\36 - Results of an Au foil in the beamline37 - Further discussion of uniformity38 39 4. BioPrep EM, JP: \\40 - Fix dates for dry-run41 - Propose dates for proper run42 43 43 5. Beam Diagnostics KL, CD: \\ 44 45 44 - Show RCF holder idea 45 - Ken update on a sparse beam diagnostic 46 46 47 47 6. DoNM 48 48 - 16th October 49 49 50 50 7. AoB