    5 == Agenda ==
     5Attended: CW, RW, AFr, EM, BT, TP, JMcG, ND, JP
     6
     7== Meeting Notes ==
    68
    791. Minutes and actions:
    810- **CD/RW/ND**: Meet to discuss RCF calibration
    911 - **Done**
    10 - **RW**: Send TP RCF data
    11  - **Done?**
    1212- **RW**: Fine-tune installation of cell carousel
    1313- **DA**: Sample simulated beamline more frequently
    1414 - **Done**
    1515- **CD**: Investigate defocussing to improve uniformity
    16  - **Stands**
     16 - **Done**
    1717- **CD/RW**: Design RCF holder
    1818 - **Done**
     
    22222. Strathclyde: BT, ED, RW \\
    2323- Processing the RCF from Phase 1
    24  - Proton Number Results
    25   - Organise Robbie, Emma and Jason to discuss the irradiation plan
    26 - Beamline setup
    27  - New minimum distance between Quads?
    28  - Cell carousel fine-tuning update
     24 - Proton Number Results:
     25  - Collected the source spectrums at 40mm from the laser target
     26  - Producing similar numbers of protons as Nick
     27  - See an interesting amount of lower energy dose
     28   - Not too concerned as expect these to get absorbed in the mylar
     29  - See transmission of ~1% for 8-10MeV and 4% for 10MeV
     30  - Robbie to send the spectra to Tony who can pass it through his G4 simulation of the cell dish and return dose rate
     31  - Slides?
    2932
    30333. Simulation CD, DA, AFr: \\
    31 - Results of an Au foil in the beamline with a better source
    32 - Results of defocussing the beam (If completed)
    33 - Results of 8MeV quad positioning
     34- Results of an Au foil in the beamline with a better source (Afr):
     35 - Greatly reduced the CV (Coefficient of Variation) in all cases due to better source
     36 - Foil in tube too close to the cells to make a difference
     37 - At tube entrance providing possibly the best option at 10.9%
     38 - Slides?
     39- Results of defocussing the beam
     40 - Manage a nice uniformity when only using a 10MeV gaussian
     41 - However, when a laser-driven source is inputted a cross reappears
     42 - Repeat uniformity tests but using selection of laser-driven spectrum
     43 - Slides?
     44- Results of 8MeV setup:
     45 - Rough results but appears the quads need to be moved closer to the source and closer together
     46 - Repeat with selection of laser-driven spectrum
     47- Next minimise CV for best quad and gold foil locations
     48 - 2x2cm foil
    3449
    35504. BioPrep EM, JP: \\
    3651- Hoods up and running
    37 - Dry-run update
     52 - Emma sent the risk assessments and cost forms to Mark
     53 - Online training to be completed
     54- Check the incubator at SCAPA
     55 - Switch on the gas on in the incubator should be 5%
     56 - Water from the bottom needs to be distilled
    3857- Final confirmation of dates
     58 - Week 1: 27/10 - 31/10
     59 - Week 2: 3/11 - 7/11
     60 - Week 3: 17/11 - 21/11
     61 - Next Thursday: LAST possible date for the discussion of the irradiation plan
     62- Contact Marie Boyd? - Yes
     63- Cells need to be fixed and stained - 9 days after irradiating
     64 - Diaza is best placed for this
     65 - Contact Marie Boyd as well
     66
     67- Discussion Point: Recreate the setup at Birmingham?
     68 - Too much effort for what it would tell us
     69 - Cyclotron struggles to have a stable beam with less than 12MeV protons
    3970
    40715. Beam Diagnostics KL, CD: \\
    4172- Show RCF holder idea
    42  - Show new design
    43  - Organise to get the RCF cut
    44 - Ken update on a sparse beam diagnostic?
     73 - Has reference to the outer curve of the carousel
     74 - Introduce a lip to fix this
     75 - Cut the RCF to 0.5mm of the measurements of the holder
     76 - Design sent to CLF to be cut
     77- Add Lanex to the outside of the cell dish to check the beam is present
     78 - Outer diameter of cell dish is 2.2cm
    4579
    46806. DoNM
    47 - 30th October
     81- Next Week: 23th Oct
    4882
    49837. AoB
    50 - Excel sheet complete with shot plan
     84- Excel sheet complete with shot plan: https://docs.google.com/spreadsheets/d/13vkixxNBZX42WFtxw7_MFJTU-gc06J19N8zpTcMKFys/edit?usp=sharing
     85- If visiting SCAPA please email Robbie and fill it out on the Google excel sheet
    5186
    5287
    5388=== Summary of actions ===
     89**RW:** Send proton numbers to Tony to get the dose rate
     90**CD/DA/Afr:** Find final beam setup with gold foil
     91**CD:** Find alternative 8MeV setup
     92**EM/JMcG/DA/more visitors:** Complete the online training indicated by Mark
     93**CW/RW:** Turn on and clean the water in the incubators
     94**CW/Most likely to get their attention:** Contact Marie Boyd
     95**RW:** Add lip to RCF holder
     96
     97
     98
    5499
    55100