LhARA radiobiology; meeting: 16Oct25; 14:00 BST
ZOOM: https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
Attended: CW, RW, AFr, EM, BT, TP, JMcG, ND, JP, KL
Meeting Notes
- Minutes and actions:
- CD/RW/ND: Meet to discuss RCF calibration
- Done
- RW: Fine-tune installation of cell carousel
- DA: Sample simulated beamline more frequently
- Done
- CD: Investigate defocussing to improve uniformity
- Done
- CD/RW: Design RCF holder
- Done
- KL: Discuss sparse diagnostic at CLF
- Done
- Strathclyde: BT, ED, RW
- Processing the RCF from Phase 1
- Proton Number Results:
- Collected the source spectrums at 40mm from the laser target
- Producing similar numbers of protons as Nick
- See an interesting amount of lower energy dose
- Not too concerned as expect these to get absorbed in the mylar
- See transmission of ~1% for 8-10MeV and 4% for 10MeV
- Slides
- Robbie to send the spectra to Tony who can pass it through his G4 simulation of the cell dish and return dose rate
- Proton Number Results:
- Simulation CD, DA, AFr:
- Results of an Au foil in the beamline with a better source (Afr):
- Greatly reduced the CV (Coefficient of Variation) in all cases due to better source
- Foil in tube too close to the cells to make a difference
- At tube entrance providing possibly the best option at 10.9%
- Slides
- Robbie provided locations of Gold foil:
- [raw_attachment:AU_Foil_placement_15102025_v1.pdf Slides]
- Results of defocussing the beam
- Manage a nice uniformity when only using a 10MeV gaussian
- However, when a laser-driven source is inputted a cross reappears
- Repeat uniformity tests but using selection of laser-driven spectrum
- Slides
- Results of 8MeV setup:
- Rough results but appears the quads need to be moved closer to the source and closer together
- Repeat with selection of laser-driven spectrum
- Next minimise CV for best quad and gold foil locations
- 2x2cm foil
- BioPrep EM, JP:
- Hoods up and running
- Emma sent the risk assessments and cost forms to Mark
- Online training to be completed
- Check the incubator at SCAPA
- Switch on the gas on in the incubator should be 5%
- Water from the bottom needs to be distilled
- Final confirmation of dates
- Week 1: 27/10 - 31/10
- Week 2: 3/11 - 7/11
- Week 3: 17/11 - 21/11
- Next Thursday: LAST possible date for the discussion of the irradiation plan
- Contact Marie Boyd? - Yes
- Cells need to be fixed and stained - 9 days after irradiating
- Diaza is best placed for this
- Contact Marie Boyd as well
- Discussion Point: Recreate the setup at Birmingham?
- Too much effort for what it would tell us
- Cyclotron struggles to have a stable beam with less than 12MeV protons
- Beam Diagnostics KL, CD:
- Show RCF holder idea
- Has reference to the outer curve of the carousel
- Introduce a lip to fix this
- Cut the RCF to 0.5mm of the measurements of the holder
- Design sent to CLF to be cut
- Slide
- Add Lanex to the outside of the cell dish to check the beam is present
- Outer diameter of cell dish is 2.2cm
- DoNM
- Next Week: 23th Oct
- AoB
- Excel sheet complete with shot plan: https://docs.google.com/spreadsheets/d/13vkixxNBZX42WFtxw7_MFJTU-gc06J19N8zpTcMKFys/edit?usp=sharing
- If visiting SCAPA please email Robbie and fill it out on the Google excel sheet
Summary of actions
- RW: Send proton numbers to Tony to get the dose rate
- CD/DA/Afr: Find final beam setup with gold foil
- CD: Find alternative 8MeV setup
- EM/JMcG/DA/more visitors: Complete the online training indicated by Mark
- CW/RW: Turn on and clean the water in the incubators
- CW/Most likely to get their attention: Contact Marie Boyd
- RW: Add lip to RCF holder
Last modified
2 days ago
Last modified on Oct 16, 2025, 5:22:48 PM
Attachments (6)
- AU_Foil_placement_15102025_v1.pdf (223.7 KB ) - added by 2 days ago.
- LhARA_PoPLaR_RCF_Spectra.pptx (3.2 MB ) - added by 2 days ago.
- Presentation_GoldScatterer_16102025_AFernandez.pdf (1.4 MB ) - added by 2 days ago.
- CDyson_Uniformity_via_defocussing.pptx (2.2 MB ) - added by 2 days ago.
- RCF_Holder.png (41.6 KB ) - added by 2 days ago.
- RCF_Holder.2.png (233.2 KB ) - added by 2 days ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.