Changes between Version 7 and Version 8 of Research/LhARA/RadiationBiology/Meetings/2025-10-23
- Timestamp:
- Oct 23, 2025, 4:13:59 PM (3 days ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/RadiationBiology/Meetings/2025-10-23
v7 v8 2 2 3 3 **ZOOM:** https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1 4 5 Attended: CD, EM, AFr, KL, JMcG, CW, TP 4 6 5 7 == Meeting Notes == … … 13 15 - **Stands** 14 16 - **CD:** Find alternative 8MeV setup 15 - ** Stands**17 - **Done** 16 18 - **EM/JMcG/DA/more visitors:** Complete the online training indicated by Mark 17 19 - **Stands** … … 19 21 - **Stands** 20 22 - **CW:** Contact Marie Boyd 21 - ** Stands**23 - **Done** Waiting 22 24 - **RW:** Add lip to RCF holder 23 25 - **Stands** … … 28 30 - Fine-tune carousel 29 31 - Incubator not turned on yet 30 - Colin offered to sort it, just needs access 31 - Contacted Marie Boyd via Paul, still waiting for a response 32 - Colin offered to sort it; just needs access 32 33 33 34 3. Simulation CD, DA, AFr: \\ 34 35 - Results of 8MeV setup 35 36 - 8MeV requires smaller drifts, but there are some values that fall into an acceptable range. 37 - [raw-attachment: Slides] 36 38 - Priority is to achieve a high dose, uniformly across the dish. Uniformity needs to be no more than 10%. Also must be uniform across the depth of the dish too, so no Bragg peaks, which means no protons entering the media with less than 1MeV. 37 39 - Set up optimisation to find the best setup to achieve this. … … 39 41 4. BioPrep EM, JP: \\ 40 42 - Finalised irradiation plan 41 - Linked?43 - [raw-attachment: Slides] 42 44 - Confirmation of plan for staining cells - when and who is needed 43 45 - Need to have someone available on the 14th to do staining from the 5th. … … 54 56 - No update 55 57 - Real-time beam diagnostic 56 - Lanex cannot be p alced around the cell dish as previously hoped. No room to fit the camera in.58 - Lanex cannot be placed around the cell dish as previously hoped. No room to fit the camera in. 57 59 58 60 6. DoNM … … 68 70 ---- 69 71 70 Summary of Acti 72 === Summary of actions === 73 - **CD/DA/Afr:** Find final beam setup with gold foil 74 - **Visitors:** Complete the online training indicated by Mark 75 - **CW/RW:** Turn on and clean the water in the incubators 76 - **RW:** Add lip to RCF holder 77 - **RW/TP/CD:** Meet to discuss dose rate calculation. Tony to send an email for the meeting time. 78 - **DA:** Confirm availability for staining 79 - **CD:** Confirm possiblity of completing staining at the weekend 80 - **CD:** Fine-tune run plan for first week and fill out details from irradiation plan 81
