LhARA radiobiology; meeting: 23Oct25; 14:00 BST
ZOOM: https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
Attended: CD, EM, AFr, KL, JMcG, CW, TP
Meeting Notes
- Minutes and actions:
- RW: Fine-tune installation of cell carousel
- Stands
- RW: Send proton numbers to Tony to get the dose rate
- Done
- CD/DA/Afr: Find final beam setup with gold foil
- Stands
- CD: Find alternative 8MeV setup
- Done
- EM/JMcG/DA/more visitors: Complete the online training indicated by Mark
- Stands
- CW/RW: Turn on and clean the water in the incubators
- Stands
- CW: Contact Marie Boyd
- Done Waiting
- RW: Add lip to RCF holder
- Stands
- Strathclyde: BT, ED, RW
- Dose rate updates
- Tony and Calvin to meet with Robbie to sort this out. Invite Nick Dover as well
- Fine-tune carousel
- Incubator not turned on yet
- Colin offered to sort it; just needs access
- Simulation CD, DA, AFr:
- Results of 8MeV setup
- 8MeV requires smaller drifts, but there are some values that fall into an acceptable range.
- Slides
- Priority is to achieve a high dose, uniformly across the dish. Uniformity needs to be no more than 10%. Also must be uniform across the depth of the dish too, so no Bragg peaks, which means no protons entering the media with less than 1MeV.
- Set up optimisation to find the best setup to achieve this.
- BioPrep EM, JP:
- Finalised irradiation plan
- Confirmation of plan for staining cells - when and who is needed
- Need to have someone available on the 14th to do staining from the 5th.
- Contact Diaza about whether he will be available
- Contact Robbie about clearing people for weekend work in case clonogenics are done on the Thursday or Friday
- For the clonogenic cells in the third week Emma will stain these and then bring them back to Birmingham
- Cannot be done on the 28th so clonogenics on the third week should be aimed for Tuesday, the 18th Nov
- Marie Boyd has been contacted but no response
- Beam Diagnostics KL, CD:
- RCF update
- Trying to get as much done as possible at Imperial with Kevin
- Lip on RCF holder
- No update
- Real-time beam diagnostic
- Lanex cannot be placed around the cell dish as previously hoped. No room to fit the camera in.
- DoNM
- Next Week: 30th Oct
- AoB
- Confirm everyone has filled out the sheet and confirmed they are visiting
- Link to the sheet: https://docs.google.com/spreadsheets/d/13vkixxNBZX42WFtxw7_MFJTU-gc06J19N8zpTcMKFys/edit?usp=sharing
- Ken to determine visiting dates
- Emma to fill out sheet but has completed training
- Visitors complete the online training indicated by Mark
Summary of actions
- CD/DA/Afr: Find final beam setup with gold foil
- Visitors: Complete the online training indicated by Mark
- CW/RW: Turn on and clean the water in the incubators
- RW: Add lip to RCF holder
- RW/TP/CD: Meet to discuss dose rate calculation. Tony to send an email for the meeting time.
- DA: Confirm availability for staining
- CD: Confirm possibility of completing staining at the weekend
- CD: Fine-tune run plan for first week and fill out details from irradiation plan
- KL/CD: Get RCF cut
Last modified
18 hours ago
Last modified on Oct 23, 2025, 4:35:59 PM
Attachments (1)
- 10MeV_vs_8MeV.pptx (1.8 MB ) - added by 18 hours ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.
