LhARA radiobiology; meeting: 28May26; 14:00 GMT
ZOOM: https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
Attended: PH, JMcG, AFr, MH, JPi, CD
Meeting Notes
- Overview of desired paper and required aims for next SCAPA beamtime
- Dates: July/August
- Steps before next beamtime and discussion
- Document: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?usp=sharing
- Do we have a set beamtime?
- Cell control tests should be done with irradiated cells as well
- Can use Marie's lab
- Mark has a Timepix detector to use as an alpha-particle detector and OSL he will test.
- If successful, can bring to SCAPA as LET detectors
- Discussion of aims post-October
- Aims for ELI
- Thanks to Emma for coordinating the bid
- Josie requires more details on the low energy beams at ELI. Currently, can only find information on the 68MeV beams.
- Calvin to ask Robbie tomorrow.
- Quick updates
- In-beam diagnostic
- PH: Presentation on hollow fibre readout plan
- Slides
- Peter has ordered some plastic silicone fibre with hollow core.
- Zemax simulations show a fibre with a 1.6mm core has 0.14% to ~1m away.
- Bending must be constant so require tubing and stands to hold the fibres in place
- Must consider the 10mm thick glass porthole
- Need the dimensions of the vacuum chamber to be able to recreate and test at Imperial
- PH: Presentation on hollow fibre readout plan
- Bioprep
- None
- SCAPA
- None
- In-beam diagnostic
- Trello
- DoNM
- 11/06/26
- AoB
Summary of actions required
In-Beam Diagnostics
- Unassigned: Acquire a glass sheet
- Unassigned: Get a new RCF batch and calibrate
- PH: Investigate how to get the light out of the vacuum chamber
- CD: Simulate energy deposited in transport fibres
- KL, CD, JMcG, PH: Make a full scifi prototype
- KL, CD, JMcG, PH: Discuss visit to Birmingham to test SciFi
- RW, CD: Study correlation between laser diagnostics and mean dose
- Unassigned: Investigate how a phosphor sheet could be incorporated into the design of the cell dish
Bio Next Steps
- EM, CD, JMcG: Write up technical summary of Phase 2
- EM: Write up a biology plan for a 2 PMQ setup
- Unassigned: Obtain an inverted microscope
- Unassigned: Obtain multi-chamber haemocytometers (Might be able to use Birmingham's)
- MB, JP, MB: Meet up to plan cell survival dry run
- EM: Run controls to examine how long the cells can survive vertically
Beamline Modelling
- RW: Examine energy spectra variation
- RW, CD: Source characterisation
Other Beamlines
- JMcG: Simulate BELLA
- JMcG: Simulate ELI
Last modified
2 days ago
Last modified on May 28, 2026, 3:25:43 PM
Attachments (1)
- LhARA_28May26.pdf (1.2 MB ) - added by 2 days ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.