Meeting Notes
- BioPrep
- Josie: Summary of last week's biology meeting:
- Bio plan being prepped short- and long-term, covering both experiments within our existing collaboration remit and ways to expand the team/bring in outside experts.
- Jason and Emma have mapped internal biological experiments comparing radiation source results from cells to organoids to animals (see Emma's RAL lecture).
- Plan to hold a seminar day with the wider field to showcase LhARA, discuss overlapping work, and identify partners suited to joining LhARA or collaborating.
- Further meetings needed to nail down specifics for both the seminar and near-term experiments.
- Instrumentation
- RCF:
- Tony investigated delaminated EBT3 as a thinner alternative for dosimetry (minimal dose interference) but couldn't source it. Discussed manufacturing our own instead.
- Marie flagged that Alexander Mullen works on polymer thinning/stretching — plan to meet him to discuss making a thin sheet to sit in front of the cells without significantly reducing dose.
- Also agreed to reach out to NPL: Richard G. will connect with Giuseppe to discuss their similar process.
- Richard also mentioned the benefit in looking at fast electrons and will report back findings at the next meeting.
- Scifi:
- Unlikely to get clear fibre to Robbie before he goes to ELI and want to test it at Birmingham first
- Equipment currently at Queen Mary's (Ken talking to them)
- Air Scintillation
- Colin/Narendar: Planning to meet to discuss the feasibility of the implementation at SCAPA and the timeframe
- SCAPA
- Team busy- no updates this week
- Alternate Beamlines
- No ELI feedback yet
- Review Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
- DoNM
- 20/08/26
- AoB
Summary of actions required
In-Beam Diagnostics
- Unassigned: Acquire a glass sheet
- Unassigned: Get a new RCF batch and calibrate
- TP: Testing delaminating EBT3
- PH: Obtain transparent fibre or an alternative method for light transport
- PH: Obtain a lens for hollow fibre tests
- CD: Simulate energy deposited in transport fibres
- KL, CD, JMcG, PH: Design a system to make full scifi prototypes
- KL, CD, JMcG, PH: Make a full scifi prototype
- KL, CD: Send clear fibre to SCAPA before 16th August (Contact Ewan or Colin since Robbie is USA)
- KL, CD, JMcG, PH: Discuss visit to Birmingham to test SciFi
- RW, CD: Study the correlation between laser diagnostics and mean dose
- Unassigned: Investigate how a phosphor sheet could be incorporated into the design of the cell dish
- CW: Investigate the feasibility of ICTs for our beamline
- MH: Investigate LET detector
- CW: Ask Narender about air fluorescence implementation
- JMcG: Investigate using IF as a dosimeter
Bio Next Steps
- EM, CD, JMcG: Write up technical summary of Phase 2
- EM: Write up a biology plan for a 2 PMQ setup
- Unassigned: Obtain an inverted microscope
- Unassigned: Obtain multi-chamber haemocytometers (Might be able to use Birmingham's)
- Unassigned: Obtain a thermostat for the incubator
- EM: Run controls to examine how long the cells can survive vertically
- JMcG: Plan a test of vertical cell survival using Emma/Jason's HeLa cell line and Marie's cell line
- JMcG: Produce a HeLa colony that can survive on Mylar
Beamline Modelling
- Unassigned: Investigate how to improve the beamline beyond CV=8%
- CD: Examine energy spectra variation
- RW, CD: Source characterisation
Alternate Beamlines
- JMcG: Simulate BELLA
- JMcG: Simulate ELI
Note: