Changes between Initial Version and Version 1 of Research/LhARA/RadiationBiology/Meetings/2026-09-03


Ignore:
Timestamp:
Sep 2, 2026, 2:53:51 PM (9 days ago)
Author:
ccd24
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/RadiationBiology/Meetings/2026-09-03

    v1 v1  
     1= LhARA Radiobiology Meeting: 03Sep26; 14:00 BST =
     2
     3**ZOOM:** https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
     4
     5- Planning Document: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?tab=t.0
     6
     7- Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
     8
     9== Meeting Agenda ==
     10
     111. Alternate Beamlines
     12 - ELI proposal feedback
     13
     142. BioPrep
     15 - Updates
     16
     173. Instrumentation
     18 - Fast Electrons
     19  - Updates
     20 - RCF
     21  - Updates on EBT4 delaminated
     22 - SciFi
     23  - Updates
     24
     255. Beamline Simulations
     26 - Updates
     27
     286. SCAPA
     29 - Updates
     30
     317. Review Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
     32
     338. DoNM
     34 - 17/09/26
     35
     369. AoB
     37
     38=== Summary of actions required ===
     39
     40In-Beam Diagnostics
     41- **Unassigned**: Acquire a glass sheet
     42- **Unassigned**: Get a new RCF batch and calibrate
     43- **TP**: Testing delaminating EBT3
     44- **PH**: Obtain transparent fibre or an alternative method for light transport
     45- **PH**: Obtain a lens for hollow fibre tests
     46- **CD**: Simulate energy deposited in transport fibres
     47- **KL, CD, JMcG, PH**: Design a system to make full scifi prototypes
     48- **KL, CD, JMcG, PH**: Make a full scifi prototype
     49- **KL, CD**: Send clear fibre to SCAPA before 16th August (Contact Ewan or Colin since Robbie is USA)
     50- **KL, CD, JMcG, PH**: Discuss visit to Birmingham to test SciFi
     51- **RW, CD**: Study the correlation between laser diagnostics and mean dose
     52- **Unassigned**: Investigate how a phosphor sheet could be incorporated into the design of the cell dish
     53- **CW**: Investigate the feasibility of ICTs for our beamline
     54- **MH**: Investigate LET detector
     55- **CW**: Ask Narender about air fluorescence implementation
     56- **JMcG**: Investigate using IF as a dosimeter
     57- **GS, RH**: Investigate fast electron diagnostic
     58- **TP**: Investigating commerical delaminated EBT4
     59
     60
     61Bio Next Steps
     62- **EM, CD, JMcG**: Write up technical summary of Phase 2
     63- **EM**: Write up a biology plan for a 2 PMQ setup
     64- **Unassigned**: Obtain an inverted microscope
     65- **Unassigned**: Obtain multi-chamber haemocytometers (Might be able to use Birmingham's)
     66- **Unassigned**: Obtain a thermostat for the incubator
     67- **EM**: Run controls to examine how long the cells can survive vertically
     68- **JMcG**: Plan a test of vertical cell survival using Emma/Jason's HeLa cell line and Marie's cell line
     69- **JMcG**: Produce a HeLa colony that can survive on Mylar
     70- **CW, AM**: Show Alex around SCAPA
     71
     72Beamline Modelling
     73- **Unassigned**: Investigate how to improve the beamline beyond CV=8%
     74- **CD**: Examine energy spectra variation
     75- **JMcG, ED**: Discuss spectra fits and SCAPA source divergence
     76- **JMcG**: Talk to Darsebury to get more information on sensible dipole parameters
     77
     78Alternate Beamlines
     79- **JMcG**: Simulate BELLA
     80- **JMcG**: Simulate ELI
     81
     82----