  • Research/LhARA/RadiationBiology/Meetings/2026-09-03

    v1 v2  
    11111. Alternate Beamlines
    1212 - ELI proposal feedback
     13  - Got rejected for several reasons but most are things we can deal with and the evaluators were generally positive and encouraged resubmission
     14  - Next proposals for ELI have a deadline in October
     15   - Beamtime next year
     16  - Ken checking whether ELIMED is part of that
     17  - Calvin to make a planning document so we can list the challenges and fill out how we will deal with them
     18   - Discuss with ELI instrumentation team to make acceptance as likely as possible
     19  - Discussion on beam energy
     20   - Marie and Rosh have done a gap analysis and found one looking at <10MeV protons
     21   - Fear that focussing on lower energy will not appeal to ELI since they have the technology to reach 60MeV
     22   - ELI also appears to have lower beam quality as you go to lower energy
     23   - Jason has comparison at Clatterbridge for 60MeV and 28MeV
     24   - Could suggest higher energies but also no clear indication that lower energy was a reason we got rejected since we did not mention beam energy in the original submission
    1325
    14262. BioPrep
    15  - Updates
     27 - Ken and Josie did a review
     28  - Ken showed a figure showing cell death and very little difference between laser-driven and conventional but also multi-pulse and single shots
     29   - Aim should be to improve on this
     30 - Rosh and Marie have done a gap analysis
     31  - They need to get the cells from Birmingham to start doing tests on transwells and the carousel
     32  - Rosh has started defrosting cells
     33  - They have also started looking at clever cell dish designs
     34  - Ken found one with RCF sandwiched in between that he will send over to them
     35 - Transwells are made for certain sizes: 12mm or 24mm
     36  - 12mm would make more sense for us
     37  - Requires at least 3 replicates
     38  - Marie to test this with the x-ray irradiator
     39  - Investigate if they get enough cells
     40  - Smaller dish also means more beam to use for instrumentation
     41  - Need a technical document on the transwells as well
     42  - Marie to send specifications of the transwells to Tony.
     43  - Send some to Birmingham so Tony (Emma) can test the transwells there as well.
    1644
    17453. Instrumentation
    18  - Fast Electrons
    19   - Updates
    2046 - RCF
    2147  - Updates on EBT4 delaminated
     48  - Asked but everyone been on holiday
     49 - The self-attempts were not working too well
    2250 - SciFi
    23   - Updates
     51  - Calvin collecting the camera equipment to test from QMUL
     52  - Ken, Josie and Calvin to meet tomorrow to take this forward
    2453
    25545. Beamline Simulations
    26  - Updates
     55 - Fatima has joined us who works at ELI-NP
     56  - Going to help simulate ELI and Josie will try and reproduce her simulations
     57 - Josie waiting on Ewan and Robbie to return to understand her simulations further and get some more information
     58 - Josie has been talking to Hywel about the dipole designs
    2759
    28606. SCAPA
     
    3567
    36689. AoB
     69- WELCOME FATIMA!!!
    3770
    3871=== Summary of actions required ===
     
    5891- **TP**: Investigating commerical delaminated EBT4
    5992
    60 
    6193Bio Next Steps
    6294- **EM, CD, JMcG**: Write up technical summary of Phase 2
     
    69101- **JMcG**: Produce a HeLa colony that can survive on Mylar
    70102- **CW, AM**: Show Alex around SCAPA
     103- **MB, RA**:
    71104
    72105Beamline Modelling
     
    79112- **JMcG**: Simulate BELLA
    80113- **JMcG**: Simulate ELI
     114- **CD**: Plannig doc for ELI
    81115
    82116----