Changes between Initial Version and Version 1 of Research/LhARA/RadiationBiology/Meetings/2026-09-17


Ignore:
Timestamp:
Sep 17, 2026, 11:05:03 AM (2 days ago)
Author:
ccd24
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/RadiationBiology/Meetings/2026-09-17

    v1 v1  
     1= LhARA Radiobiology Meeting: 17Sep26; 14:00 BST =
     2
     3**ZOOM:** https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
     4
     5- Planning Document: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?tab=t.0
     6
     7- Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
     8
     9== Meeting Agenda ==
     10
     111. Alternate Beamlines
     12 - ELIMED part of the next ELI submission?
     13 - Template document put together for how to deal with problems raised in ELI rejection
     14
     152. BioPrep
     16 - Update from Rosh and Marie
     17  - Any cells from Birmingham?
     18 - Colin seen the X-ray machine yet?
     19 - Perodi Paper (Flacco et al) with RCF sandwich: 10.1038/s41598-025-01105-z
     20
     213. Instrumentation
     22 - RCF
     23  - Updates on delaminated EBT4
     24 - SciFi
     25  - Introducing Simon
     26  - Update on next prototype
     27 - Fast electrons
     28
     294. Beamline Simulations
     30
     315. SCAPA
     32 - Updates
     33
     346. Review Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
     35
     367. DoNM
     37 - 01/10/26
     38
     398. AoB
     40
     41
     42=== Summary of actions required ===
     43
     44In-Beam Diagnostics
     45- **Unassigned**: Acquire a glass sheet
     46- **Unassigned**: Get a new RCF batch and calibrate
     47- **TP**: Testing delaminating EBT3
     48 - **DONE?**
     49- **PH**: Obtain transparent fibre or an alternative method for light transport
     50 - **DONE**
     51- **PH**: Obtain a lens for hollow fibre tests
     52 - **DONE**
     53- **CD**: Simulate energy deposited in transport fibres
     54- **KL, CD, JMcG, SdL**: Design a system to make full scifi prototypes
     55- **KL, CD, JMcG, SdL**: Make a full scifi prototype
     56- **KL, CD, JMcG, SdL**: Discuss visit to Birmingham to test SciFi
     57- **RW, CD**: Study the correlation between laser diagnostics and mean dose
     58- **CW**: Investigate the feasibility of ICTs for our beamline
     59- **MH**: Investigate LET detector
     60- **CW**: Ask Narender about air fluorescence implementation
     61- **JMcG**: Investigate using IF as a dosimeter
     62- **GS, RH**: Investigate fast electron diagnostic
     63- **TP**: Investigating commerical delaminated EBT4
     64
     65Bio Next Steps
     66- **EM, CD, JMcG**: Write up technical summary of Phase 2
     67- **EM**: Write up a biology plan for a 2 PMQ setup
     68- **Unassigned**: Obtain an inverted microscope
     69- **Unassigned**: Obtain multi-chamber haemocytometers (Might be able to use Birmingham's)
     70- **Unassigned**: Obtain a thermostat for the incubator
     71- **EM**: Send cells to Rosh and Marie
     72- **EM, MB, RA, JMcG**: Run controls to examine how long the cells can survive vertically
     73- **CW, AM**: Show Alex around SCAPA
     74- **MB, RA**: Send specifications of and transwells to Tony to test at Birmingham
     75- **MB, RA**: Test transwells with x-rays
     76- **KL**: Share paper with interesting cell dishes (RCF sandwich)
     77
     78Beamline Modelling
     79- **Unassigned**: Investigate how to improve the beamline beyond CV=8%
     80- **CD**: Examine energy spectra variation
     81- **JMcG, ED**: Discuss spectra fits and SCAPA source divergence
     82- **JMcG**: Talk to Darsebury to get more information on sensible dipole parameters
     83
     84Alternate Beamlines
     85- **JMcG**: Simulate BELLA
     86- **JMcG**: Simulate ELI
     87- **CD**: Planning doc for ELI
     88
     89----