    5 == Meeting Agenda ==
     5Attended: PH, JMcG, MB, TP, CD, (KL)
     6
     7== Meeting Notes ==
    68
    79Plan for PoPLaR
    8101. Next SCAPA beamtime
    911 - Dates: July/August
    10  - Determine a baseline/default
    11   - Steps required for a better repeat of the cell irradiations done previously
    12    - Google doc summary: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?usp=sharing
    13    - Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
     12 - Determine a baseline:
     13  - A baseline of repeating phase 2 cell irradiations was set
    1414
    15152. Aim for October
    16  - Paper(s)?
    17  - What changes are required to that baseline plan for SCAPA to achieve that by October
     16 - Paper
     17  - Aim for a physics publication with reference to the biology results
     18 - Add to Phase 3 plan:
     19  - Comet analysis provides DNA damage results and relatively easy to complete but requires more cell irradiations
     20   - Neutral and alkaline analyses seem the best to study single- and double-strand breaks
     21   - Also see the variation across the cell dish
     22  - Compare this and the clonogenics to the cyclotron irradiation
     23 - Questions to answer:
     24  - Is the spatial variation acceptable?
    1825
    19263. Aim for Post-October
    2027 - Desired work/papers
     28  - Include IF but it is unnecessary to do in Phase 3 due to the additional irradiations required
     29  - X-ray comparison: Feasible to be included in Phase 3
     30   - Would reproduce the same irradiation conditions (time out of incubator and vertical irradiation) as laser-driven protons
    2131 - What do we need to know before we can plan more
    22  - What can we do pre-October to help that
     32  - Pre-proton electrons:
     33   - Could explore using the dipoles to remove these
     34   - Have finance for the dipole but need stands so unlikely to be Phase 3
     35  - LET measurement
     36   - LET detector researched but unknown if it will be available for Phase 3
    2337
    24384. ELI
    25  - Dates?
    26  - How does this fit into the plan
    27  - What steps need to be added to be prepared for this beamtime
     39 - Almost certainly post-October and ran out of time to properly discuss how this can be included in the plan.
    2840
    29415. Review steps required
    30  - Share Trello
     42 - Plan on Google Doc:https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?usp=sharing
     43 - Steps on Trello:https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
     44 - Updates:
     45  - Diagnostics:
     46   - RCF:
     47    - Tony is delaminating some RCF and will compare with the delaminated EBT3 Mark supplied.
     48    - If we provide a batch we will use at SCAPA Tony can test this as well and do the calibration.
     49    - Suggestion that X-ray calibration removes the high-LET saturation effect.
     50    - Marie has offered to do the RCF calibration prior to travelling up
     51   - SciFi:
     52    - Peter has found a source for hollow fibre.
     53     - Cost: £300-400 for 15m, though Peter has money that can be put towards that.
     54     - Could do with a simulation to provide an order of magnitude estimate on the energy deposited on transport fibres
     55    - Tony has offered Birmingham to test the fibres before SCAPA
     56     - Make a package of everything we need and take to Birmingham
     57     - Also, would be able to test using a fibre around the cell dish here
     58      - Keep this simple at the start and just use one fibre
     59  - Bio:
     60   - Could potentially borrow Marie's inverted microscope but depends on other lab users
     61   - Marie is keen to meet up with Jason and Emma to help organise a dry run or testing on the control cell survival
    3162
    32636. DoNM
    33  - 28/05/26
     64 - 21/05/26?
    3465
    35667. AoB
     
    5081- **Unassigned**: Get a new RCF batch and calibrate
    5182- **PH**: Investigate how to get the light out of the vacuum chamber
     83- **CD**: Simulate energy deposited in transport fibres
    5284- **KL, CD, JMcG, PH**: Make a full scifi prototype
     85- **KL, CD, JMcG, PH**: Discuss visit to Birmingham to test SciFi
    5386- **RW, CD**: Study correlation between laser diagnostics and mean dose
    5487- **Unassigned**: Investigate how a phosphor sheet could be incorporated into the design of the cell dish
     
    6194- **Unassigned**: Obtain an inverted microscope
    6295- **Unassigned**: Obtain multi-chamber haemocytometers (Might be able to use Birmingham's)
     96- **MB, JP, MB**: Meet up to plan cell survival dry run
    6397- **EM*: Run controls to examine how long the cells can survive vertically
    6498