31 | | Present: |
| 31 | Present: Ruth, Will, HT, Theo, Ajit |
| 32 | |
| 33 | * Gabor lens update |
| 34 | * Design changes in the pipeline. |
| 35 | * Pump being refurbished. |
| 36 | * SciWire update |
| 37 | * Tests with source done but rate from the source much lower than expected so could not see scintillation light. |
| 38 | * Will try testing with a torch+collimator. |
| 39 | * SmartPhantom update |
| 40 | * Winding tests done with fishing wire. Frames being redesigned to improve stiffness and prevent warping. |
| 41 | * Round table. |
| 42 | * Ruth: Hammersmith machine being used for treatment. |
| 43 | * Will: |
| 44 | * Working on applications with IBA |
| 45 | * HT: Would like scoring planes to simulate the water phantom. |
| 46 | * In development branch. Waiting to be merged. |
| 47 | * Can consider installing linux on Windows using Windows subsystem for linux on the server. This would allow installing BDSIM in Windows. |
| 48 | * Theo: Doing GPT simulations investigating phase space and emittance with different levels of space charge. Optimising design of the arc using MADX. |
| 49 | * AOB |
| 50 | * New server delivered. Operating system will be installed by ICT. |