| Version 1 (modified by , 3 years ago) ( diff ) | 
|---|
Minutes:
- Have the same goal as pre-summer, but taking it from a different starting point
 - Job is to design the detector using 250 micron fibres (already made)
 - Need to talk to Oliver- engineer – about frame and design
 - Found that uniformity over a large distance for the fibres was bad
 - Meetings
- Ionoacosutics every thursday (10:00)
 - Meeting with Ken every week (TBC)
 
 
  Note:
 See   TracWiki
 for help on using the wiki.
    