Version 1 (modified by 2 years ago) ( diff ) | ,
---|
Minutes:
- Have the same goal as pre-summer, but taking it from a different starting point
- Job is to design the detector using 250 micron fibres (already made)
- Need to talk to Oliver- engineer – about frame and design
- Found that uniformity over a large distance for the fibres was bad
- Meetings
- Ionoacosutics every thursday (10:00)
- Meeting with Ken every week (TBC)
Note:
See TracWiki
for help on using the wiki.