| Version 2 (modified by , 10 days ago) ( diff ) |
|---|
LhARA Radiobiology Meeting: 15Oct26; 14:00 BST
ZOOM: https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
- Planning Document: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?tab=t.0
Meeting Agenda
- Alternate Beamlines
- ELI proposal:
- Calvin has put together a draft document
- (Not aiming for the 20th October deadline)
- ELI proposal:
- BioPrep
- Update from SCAPA that February is too early
- Update from RadioBio meeting
- Draft paper
- Josie to take the cells from Birmingham to Glasgow
- Colin seen the X-ray machine yet?
- Instrumentation
- RCF
- Update on Tony's free sample of the new film?
- SciFi
- Update
- Coincide the Birmingham tests with Josie taking the cells?
- Thin wall ion chamber and Diamond detector
- Does Richard have a planned date to present on this?
- Air fluorescence
- Colin discussed this more with Narender?
- RCF
- SCAPA
- Updates
- Review Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
- DoNM
- 29/10/26
- AoB
Summary of actions required
In-Beam Diagnostics
- Unassigned: Acquire a glass sheet
- Unassigned: Get a new RCF batch and calibrate
- SdL: Simulate energy deposited in transport fibres
- KL, CD, JMcG, SdL: Design a system to make full scifi prototypes
- KL, CD, JMcG, SdL: Make a full scifi prototype
- KL, CD, JMcG, SdL: Discuss visit to Birmingham to test SciFi
- RW, CD: Study the correlation between laser diagnostics and mean dose
- CW: Investigate the feasibility of ICTs for our beamline
- MH: Investigate LET detector
- CW: Ask Narender about air fluorescence implementation
- JMcG: Investigate using IF as a dosimeter
- RH: Present about thin wall and diamond detectors at a Tuesday meeting
Bio Next Steps
- EM, CD, JMcG: Write up technical summary of Phase 2
- EM, MB, RA, JMcG: Write up a biology plan for a 2 PMQ setup
- CW, MB, RA: Obtain an inverted microscope
- MB, RA: Obtain multi-chamber haemocytometers
- DONE
- RW: Obtain a thermostat for the incubator
- EM, JMcG: Send cells to Rosh and Marie
- EM, MB, RA, JMcG: Run controls to examine how long the cells can survive vertically
- CW, AM: Show Alex around SCAPA
- DONE
- MB, RA: Test transwells with x-rays
- CW: Find the best meeting times for Marie
- DONE
- CW: Reach out to SCAPA team to confirm February is the goal
- DONE
Beamline Modelling
- CD: Examine energy spectra variation
- JMcG, ED: Discuss spectra fits and SCAPA source divergence
- SdL: Investigating secondary particles in the beamline
Alternate Beamlines
- JMcG: Simulate BELLA
- JMcG: Simulate ELI
- CD: Planning doc for ELI
- DONE
Note:
See TracWiki
for help on using the wiki.
