wiki:Research/LhARA/RadiationBiology/Meetings/2026-10-15

Version 3 (modified by ccd24, 10 days ago) ( diff )

--

LhARA Radiobiology Meeting: 15Oct26; 14:00 BST

ZOOM: ​https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1

Attended: CW, WS, FA, MD, JMcG, SdL, KL, CD

Meeting Notes

  1. Alternate Beamlines
    • ELI proposal:
      • Calvin has put together a draft document
      • Will share it with the relevant people
      • (Not aiming for the 20th October deadline)
  1. BioPrep
    • Update from SCAPA that February is too early
      • June 27th is when SCAPA is expecting to run protons again
        • Realistically, this means "summer"
      • Continue with the same plan for cells rather than delay
    • Colin may be in Birmingham sometime this month so could transport the cells
      • Update after this weekend
    • Update from RadioBio meeting
      • Draft paper based on Josie's technical note
    • X-ray machine currently broken so Colin has not yet seen it.
      • Not yet
  1. Instrumentation
    • RCF
      • No Update
    • SciFi
      • Update: Base fine-tuning.
    • Thin wall ion chamber and Diamond detector
      • No Update
    • Air fluorescence
      • Colin discussed this more with Narender?
        • Waiting for a full plan and time first
  1. SCAPA
    • Updates
      • Could look at the full beamline to improve and move things around
      • Make edits to the carousel etc
      • Need to learn about the experiment we are parasiting off so that we know what the setup will be.
  1. Review Trello: ​https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
  1. DoNM
    • 29/10/26
  1. AoB
    • LhARA/CLF Workshop!!!

Summary of actions required

In-Beam Diagnostics

  • Unassigned: Acquire a glass sheet
  • Unassigned: Get a new RCF batch and calibrate
  • TP: Testing a free sample of a new film
  • SdL: Simulate energy deposited in transport fibres
  • KL, CD, JMcG, SdL: Design a system to make full scifi prototypes
  • KL, CD, JMcG, SdL: Make a full scifi prototype
  • KL, CD, JMcG, SdL: Discuss visit to Birmingham to test SciFi
  • RW, CD: Study the correlation between laser diagnostics and mean dose
  • CW: Investigate the feasibility of ICTs for our beamline
  • MH: Investigate LET detector
  • CW: Ask Narender about air fluorescence implementation
  • JMcG: Investigate using IF as a dosimeter
  • RH: Present about thin wall and diamond detectors at a Tuesday meeting

Bio Next Steps

  • EM, CD, JMcG: Write up technical summary of Phase 2
  • EM, MB, RA, JMcG: Write up a biology plan for a 2 PMQ setup
  • CW, MB, RA: Obtain an inverted microscope
  • RW: Obtain a thermostat for the incubator
  • EM, JMcG: Send cells to Rosh and Marie
  • EM, MB, RA, JMcG: Run controls to examine how long the cells can survive vertically
  • MB, RA: Test transwells with x-rays
  • CW: X-ray beam unflatenner

Beamline Modelling

  • CD: Examine energy spectra variation
  • JMcG, ED: Discuss spectra fits and SCAPA source divergence
  • SdL: Investigating secondary particles in the beamline

Alternate Beamlines

  • JMcG: Simulate BELLA
  • JMcG: Simulate ELI
  • CD: Planning doc for ELI
    • DONE

Note: See TracWiki for help on using the wiki.