Version 1 (modified by 4 years ago) ( diff ) | ,
---|
CCAP Plenary Meeting 6
24th June 2020; 14:00—17:00
ZOOM video conference; ZOOM details to be announced.
Agenda
The agenda is being developed. If you wish to make a presentation, please contact Ken Long (K.Long@…) or Ajit Kurup (a.kurup@…).
Time | Title | Speaker |
14:00 | Welcome and introduction | K. Long (ICL) |
14:15--15:15 | LhARA, status and plans | |
14:15 | Preparations for the LhARA pre-CDR | A. Kurup (ICL) |
14:45 | Status report for the Laser driven proton and ion source work package | O. Ettlinger (ICL) |
15:00 | Status report for the Proton and ion capture work package | J. Pozimski (ICL) and C. Whyte (Strathclyde) |
15:15 | Status report for the Stage 1 and Stage 2 beam transport work packages. Status of LhARA (J. Pasternak). Status of simulations (W. Shields). | J. Pasternak (ICL) and W. Shields (RHUL) |
15:30 | Coffee break | |
15:50 | Status report for the Infrastructure and integration work package | J. Thomason (RAL) and G. Aymar (RAL) |
16:05 | Status report for the end-to-end simulation work package | A. Kurup (ICL) |
16:20 | Review of activities at Charing Cross Hospital | R. Mclauchlan (CXH) |
16:35 | Analysis of CT images | A. Moawad and L. Jaugey (ICL/EPFL) |
16:50 | Progress with solid state detectors | A. Howard (ICL) |
17:05 | Status of the SmartPhantom development | HT Lau (ICL) |
17:20 | Status of the biological end stations | J. Parsons (Liverpool) |
17:50 | Closing Discussions | All |
Attachments (15)
- 14-RMcL_Imaging_AI_ML_Opportunities_CCAP_Plenary_240620.pdf (1.1 MB ) - added by 4 years ago.
- 01-2020-06-24-Long.pptx (14.9 MB ) - added by 4 years ago.
- 12-AH_CCAP_June2020.pdf (218.9 KB ) - added by 4 years ago.
- LhARA_Design_24062020.pdf (2.4 MB ) - added by 4 years ago.
- 2020-06-24-Kurup-LhARAOverview.pdf (655.4 KB ) - added by 4 years ago.
- Radiobiology overview 240620 Parsons.pptx (4.3 MB ) - added by 4 years ago.
- WShields_CCAP_Plenary_24062020.pdf (5.0 MB ) - added by 4 years ago.
- Radiobiology-overview-240620-Parsons.pptx (4.3 MB ) - added by 4 years ago.
- 05-JH-CCAP-Plenary-240620.pptx (2.1 MB ) - added by 4 years ago.
- 06-CCAP-MelbourneGroupSynergies.pptx (8.5 MB ) - added by 4 years ago.
- 09-CCAP_LhARA-PlenaryMeeting240620_Merchant.pptx (22.5 MB ) - added by 4 years ago.
- 10-MicrobeamInstrumentation_june_2020.pdf (1.8 MB ) - added by 4 years ago.
- 08-presentation_CCAP_TimSchneider.pdf (11.7 MB ) - added by 4 years ago.
- 11-CCAP_MC40_June2020.pptx (7.6 MB ) - added by 4 years ago.
- 13-Lhara_Inst_Plenary_v2.pptx (10.9 MB ) - added by 4 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.