Changes between Version 1 and Version 2 of Research/DesignStudy/Meetings/2018-10-16-LARA
- Timestamp:
- Oct 16, 2018, 3:55:12 PM (6 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/DesignStudy/Meetings/2018-10-16-LARA
v1 v2 25 25 == Notes: == 26 26 27 '''Present:''' 27 '''Present:''' JPo, GB, VB, CH, KL, AK, OE, JPa 28 28 29 29 1. Introduction and status of preparation of 'reference' proposal: **//KL//** 30 * Updated reference proposal still needs to be revised. This will be completed and posted for reference. 31 * Goal for this meeting is to assess and agree the end-station specification and then re-evaluate the next steps. 30 32 1. End-station siultation update: **//AK, HT//** 33 * Drawing of elements of end-station that intercept the beam [raw-attachment:mkbakffhgnpofblm.png here]. We discussed and **//agreed//**: 34 * 50micron milar for beam vacuum window (perhaps consider 50/75 micron); use MedAustron preferred cell holder; take 2mm thickness for now. 35 * GB will make calculation and practical test of vacuum windows of various thicknesses. Need a soak test. 36 * AK will bring sample holders to Imperial so that the base thickness can be measured. 37 * **//Agreed//** that the parameter table, especially energy lost in the end-station, will be updated by the end of the week. 31 38 1. Implications and next steps: **//All//** 39 * With the parameter table revised, next week we agree how to work towards a CDR. JPa explained that he believes the CDR should be based on the 'Hunt scheme' combined with electrostatic bends. 32 40 1. AoB 41 * Structure of AK's talk ([raw-attachment:AjitKurup-CCAP.pdf.pptx here]) was discussed, much feedback was given(!).