Changes between Version 1 and Version 2 of Research/DesignStudy/Meetings/2018-10-16-LARA


Ignore:
Timestamp:
Oct 16, 2018, 3:55:12 PM (6 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2018-10-16-LARA

    v1 v2  
    2525== Notes: ==
    2626
    27 '''Present:'''
     27'''Present:''' JPo, GB, VB, CH, KL, AK, OE, JPa
    2828
    29291. Introduction and status of preparation of 'reference' proposal: **//KL//**
     30 * Updated reference proposal still needs to be revised.  This will be completed and posted for reference.
     31 * Goal for this meeting is to assess and agree the end-station specification and then re-evaluate the next steps.
    30321. End-station siultation update: **//AK, HT//**
     33 * Drawing of elements of end-station that intercept the beam [raw-attachment:mkbakffhgnpofblm.png here].  We discussed and **//agreed//**:
     34  * 50micron milar for beam vacuum window (perhaps consider 50/75 micron); use MedAustron preferred cell holder; take 2mm thickness for now.
     35  * GB will make calculation and practical test of vacuum windows of various thicknesses.  Need a soak test.
     36  * AK will bring sample holders to Imperial so that the base thickness can be measured.
     37 * **//Agreed//** that the parameter table, especially energy lost in the end-station, will be updated by the end of the week.
    31381. Implications and next steps:  **//All//**
     39 * With the parameter table revised, next week we agree how to work towards a CDR.  JPa explained that he believes the CDR should be based on the 'Hunt scheme' combined with electrostatic bends.
    32401. AoB
     41 * Structure of AK's talk ([raw-attachment:AjitKurup-CCAP.pdf.pptx here]) was discussed, much feedback was given(!).