LhARA pre-CDR Meeting 10th Dec 2019
Meeting details
14:00 Room 532, Blackett Lab.
Zoom details:
Join Zoom Meeting https://ukri.zoom.us/j/865262978
Phone one-tap: United Kingdom: +442034815237,,865262978# or +442039663809,,865262978#
Join by Telephone For higher quality, dial a number based on your current location.
United Kingdom:
+44 203 481 5237
+44 203 966 3809
+44 131 460 1196
+44 203 051 2874 0800 031 5717Meeting ID: 865 262 978
Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978
International numbers https://ukri.zoom.us/u/ap9aBI2Eh
SIP: 865262978@…
Skype for Business (Lync) https://ukri.zoom.us/skype/865262978
Skype on a SurfaceHub SIP: 865262978@… https://ukri.zoom.us/skype/865262978
Agenda
- Action items from last meeting.
- AK to note the instrumentation requirements for the definition of the baseline.
- OE to circulate the blank risk assessment form.
- AK to arrange meeting to discuss the laser target interface.
- JPar to look into spot scanning beam specs for in vivo experiments.
- AK to prepare abstract for upcoming abstract deadlines.
- AK to ask Simon for a repository to store the simulation input files.
- System updates.
- Laser driven proton and ion source.
- Proton and ion capture.
- Stage 1 beam transport: Beam transport and delivery to the in vitro end station.
- Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station.
- Biological end stations.
- Infrastructure and Integration.
- Project plan for the delivery of LhARA.
- Safety.
- End-to-end simulation.
- Instrumentation.
- A.O.B.
- Plenary meeting talks.
Notes
Participants: KL, HTL, JPas, GA, WS
Apologies: JPar
- Previous action items
- AK to note the instrumentation requirements for the definition of the baseline.
- Done
- OE to circulate the blank risk assessment form.
- Done
- AK to arrange meeting to discuss the laser target interface.
- Doodle poll created. Date will be finalised soon.
- JPar to look into spot scanning beam specs for in vivo experiments.
- Stands.
- AK to prepare abstract for upcoming abstract deadlines.
- JPas circulated abstract for IPAC. Other abstracts will follow on from this.
- AK to ask Simon for a repository to store the simulation input files.
- Done.
- AK to note the instrumentation requirements for the definition of the baseline.
- System updates
- beam transport - JPas
- Working on definitions of the FFA.
- beam transport - WS
- Simulations for stage 1 and comparisons with BDSIM and GPT
- transmission goes from 1% for q=1e9 to 25% for q=1e8.
- Issue with beam definitions.
- Infrastructure and integrations.
- Ian from TD will prepare the updates of the floor plan.
- AK: need to start thinking about costing.
- Have order of magnitude guess. Can use existing projects to get comparison of costs.
- GA: what does Instrumentation cover.
- AK: Definition at the bottom of the pre-CDR preparation page Research/DesignStudy/PreCDR.
- Controls and monitoring included in integration but may want to include fast feedback specific monitoring in instrumentation.
- GA: JT spoke to CLF and will follow up.
- Simulations
- Fix on using ROOT as persisted format. Provide conversions for other formats.
- JPas: BDSIM simulation through to injection septum. FFA. Septum to end station in BDSIM.
- KL: interface at the switching magnet?
- Discussion on best location of the interface.
- Interface at input to the septum and extraction after septum.
- AK: Will prepare a wiki page for simulation.
- beam transport - JPas
Action Items
- JPar to look into spot scanning beam specs for in vivo experiments.
- AK to prepare a wiki page for simulation.