Changes between Version 2 and Version 3 of Research/DesignStudy/Meetings/2019/12-10


Ignore:
Timestamp:
Dec 16, 2019, 8:21:31 PM (5 years ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2019/12-10

    v2 v3  
    5858
    5959== Notes ==
    60 Participants:
    61 Apologies:
     60Participants: KL, HTL, JPas, GA, WS \\
     61Apologies: JPar
     62
     63 * Previous action items
     64  * AK to note the instrumentation requirements for the definition of the baseline.
     65   * Done
     66  * OE to circulate the blank risk assessment form.
     67   * Done
     68  * AK to arrange meeting to discuss the laser target interface.
     69   * Doodle poll created. Date will be finalised soon.
     70  * JPar to look into spot scanning beam specs for in vivo experiments.
     71   * Stands.
     72  * AK to prepare abstract for upcoming abstract deadlines.
     73   * JPas circulated abstract for IPAC. Other abstracts will follow on from this.
     74  * AK to ask Simon for a repository to store the simulation input files.
     75   * Done.
     76 * System updates
     77  * beam transport - JPas
     78   * Working on definitions of the FFA.
     79  * beam transport - WS
     80   * Simulations for stage 1 and comparisons with BDSIM and GPT
     81   * transmission goes from 1% for q=1e9 to 25% for q=1e8.
     82   * Issue with beam definitions.
     83  * Infrastructure and integrations.
     84   * Ian from TD will prepare the updates of the floor plan.
     85   * AK: need to start thinking about costing.
     86   * Have order of magnitude guess. Can use existing projects to get comparison of costs.
     87   * GA: what does Instrumentation cover.
     88   * AK: Definition at the bottom of the pre-CDR preparation page [wiki:/Research/DesignStudy/PreCDR].
     89   * Controls and monitoring included in integration but may want to include fast feedback specific monitoring in instrumentation.
     90   * GA: JT spoke to CLF and will follow up.
     91  * Simulations
     92   * Fix on using ROOT as persisted format. Provide conversions for other formats.
     93   * JPas: BDSIM simulation through to injection septum. FFA. Septum to end station in BDSIM.
     94   * KL: interface at the switching magnet?
     95   * Discussion on best location of the interface.
     96   * Interface at input to the septum and extraction after septum.
     97   * AK: Will prepare a wiki page for simulation.
    6298
    6399== Action Items ==
     100 * JPar to look into spot scanning beam specs for in vivo experiments.
     101 * AK to prepare a wiki page for simulation.