wiki:Research/DesignStudy/Meetings/2020/2020-01-28

LhARA pre-CDR Meeting 21st Jan 2020

Meeting details

15:00 Room 532, Blackett Lab.

Zoom details:

Join Zoom Meeting https://ukri.zoom.us/j/865262978

Phone one-tap: United Kingdom: +442034815237,,865262978# or +442039663809,,865262978#

Join by Telephone For higher quality, dial a number based on your current location.

United Kingdom:

+44 203 481 5237
+44 203 966 3809
+44 131 460 1196
+44 203 051 2874 0800 031 5717

Meeting ID: 865 262 978

Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978

International numbers https://ukri.zoom.us/u/ap9aBI2Eh

SIP: 865262978@…
Skype for Business (Lync) https://ukri.zoom.us/skype/865262978
Skype on a SurfaceHub SIP: 865262978@… https://ukri.zoom.us/skype/865262978

Agenda

  • Action items from last meeting.
    • AK to add Colin's note to the wiki.
    • JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
  • System updates.
    • Laser driven proton and ion source.
    • Proton and ion capture.
    • Stage 1 beam transport: Beam transport and delivery to the in vitro end station.
    • Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station.
    • Biological end stations.
    • Infrastructure and Integration.
    • Project plan for the delivery of LhARA.
    • Safety.
    • End-to-end simulation.
    • Instrumentation.
  • Outline of the pre-CDR.
  • R&D plan and schedule.
  • A.O.B.
    • Date of review.
    • Move time of meeting back to 14:00 from the 11th Feb

Notes

Participants: AK, WS, JPas, HTL, GA, CW, JM, KL

  • Action items from last week.
    • AK to add Colin's note to the wiki.
    • JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
      • Stands.

  • Laser capture interface
    • KL: Should start a loop with CW and Oliver Jeremy
    • CW: Would like input on what is needed from the laser guys, especially since the tapered re-entrant part pokes 5cm inwards.
  • Beam transport
    • Update to Stage 1 lattice.
    • Working on the matching, bug in the code needs fixing.
    • Stage 2 vertical arc.
      • Can use the same arc lattice as for Stage 1.
      • May need to scale lengths of the quads to make sure the magnets are not superconducting.
    • Integration
      • Discussed questions from Simeon.
        • Specific details will be finalised after the design is frozen.
        • Can make the room bigger to accommodate the laser room.
    • Instrumentation
      • AK to put JM and Alex Howard in touch.
  • pre-CDR outline
    • Copy points from the R&D plan on the wiki to the relevant sections in the pre-CDR outline.
  • R&D plan and schedule.
    • AK: No updates have been received yet.
  • A.O.B.
    • Date of the review will be finalised soon.
    • Time of the meeting will go back to 2pm from the 11th Feb.

Action items

  • JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).

Last modified 4 years ago Last modified on Feb 3, 2020 8:18:23 PM