Version 9 (modified by 5 years ago) ( diff ) | ,
---|
LhARA pre-CDR Meeting 21st Jan 2020
Meeting details
15:00 Room 532, Blackett Lab.
Zoom details:
Join Zoom Meeting https://ukri.zoom.us/j/865262978
Phone one-tap: United Kingdom: +442034815237,,865262978# or +442039663809,,865262978#
Join by Telephone For higher quality, dial a number based on your current location.
United Kingdom:
+44 203 481 5237
+44 203 966 3809
+44 131 460 1196
+44 203 051 2874 0800 031 5717Meeting ID: 865 262 978
Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978
International numbers https://ukri.zoom.us/u/ap9aBI2Eh
SIP: 865262978@…
Skype for Business (Lync) https://ukri.zoom.us/skype/865262978
Skype on a SurfaceHub SIP: 865262978@… https://ukri.zoom.us/skype/865262978
Agenda
- Action items from last meeting.
- AK to add Colin's note to the wiki.
- JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
- System updates.
- Laser driven proton and ion source.
- Proton and ion capture.
- Stage 1 beam transport: Beam transport and delivery to the in vitro end station.
- Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station.
- Biological end stations.
- Infrastructure and Integration.
- Project plan for the delivery of LhARA.
- Safety.
- End-to-end simulation.
- Instrumentation.
- Outline of the pre-CDR.
- R&D plan and schedule.
- A.O.B.
- Date of review.
- Move time of meeting back to 14:00 from the 11th Feb
Notes
Participants: AK, WS, JPas, HTL, GA, CW, JM, KL
- Action items from last week.
- AK to add Colin's note to the wiki.
- See Research/DesignStudy/PreCDR
- JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
- Stands.
- AK to add Colin's note to the wiki.
- Laser capture interface
- KL: Should start a loop with CW and Oliver Jeremy
- CW: Would like input on what is needed from the laser guys, especially since the tapered re-entrant part pokes 5cm inwards.
- Beam transport
- Update to Stage 1 lattice.
- Working on the matching, bug in the code needs fixing.
- Stage 2 vertical arc.
- Can use the same arc lattice as for Stage 1.
- May need to scale lengths of the quads to make sure the magnets are not superconducting.
- Integration
- Discussed questions from Simeon.
- Specific details will be finalised after the design is frozen.
- Can make the room bigger to accommodate the laser room.
- Discussed questions from Simeon.
- Instrumentation
- AK to put JM and Alex Howard in touch.
- pre-CDR outline
- Copy points from the R&D plan on the wiki to the relevant sections in the pre-CDR outline.
- R&D plan and schedule.
- AK: No updates have been received yet.
- A.O.B.
- Date of the review will be finalised soon.
- Time of the meeting will go back to 2pm from the 11th Feb.
Action items
- JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
Attachments (6)
- LhARA-pre-CDR.pdf (103.7 KB ) - added by 5 years ago.
-
Monitor Form 20_01_23.doc
(1.1 MB
) - added by 5 years ago.
Floor plan questions
-
LhARA_V5.0_TopDownView.png
(90.2 KB
) - added by 5 years ago.
LhARA V5.0 Top Down View
-
LhARA_V5.0.png
(138.4 KB
) - added by 5 years ago.
LhARA V5.0 Screenshot
-
LhARA_V4.2_TopDownView.png
(92.4 KB
) - added by 5 years ago.
LhARA V4.2 Top Down View
-
LhARA_V4.2.png
(147.4 KB
) - added by 5 years ago.
LhARA V4.2
Download all attachments as: .zip