wiki:Research/DesignStudy/Meetings/2020/2020-02-18

LhARA pre-CDR Meeting 18th Feb 2020

Meeting details

14:00 Room 532, Blackett Lab.

Zoom details:

Join Zoom Meeting https://ukri.zoom.us/j/865262978

Phone one-tap: United Kingdom: +442034815237,,865262978# or +442039663809,,865262978#

Join by Telephone For higher quality, dial a number based on your current location.

United Kingdom:

+44 203 481 5237
+44 203 966 3809
+44 131 460 1196
+44 203 051 2874 0800 031 5717

Meeting ID: 865 262 978

Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978

International numbers https://ukri.zoom.us/u/ap9aBI2Eh

SIP: 865262978@…
Skype for Business (Lync) https://ukri.zoom.us/skype/865262978
Skype on a SurfaceHub SIP: 865262978@… https://ukri.zoom.us/skype/865262978

Agenda

  • Action items from last meeting.
    • JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
  • System updates.
    • Laser driven proton and ion source.
    • Proton and ion capture.
    • Stage 1 beam transport: Beam transport and delivery to the in vitro end station.
    • Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station.
    • Biological end stations.
    • Infrastructure and Integration.
    • Project plan for the delivery of LhARA.
    • Safety.
    • End-to-end simulation.
    • Instrumentation.
  • R&D plan and schedule.
  • Writing the pre-CDR.
  • A.O.B.

Notes

Participants: AK, GA, JPar, HTL, WS, KL, JMat
Apologies: JPas

  • Action items
    • JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
      • Stands
  • System updates
    • Laser
      • AK to arrange meeting to discuss R&D plan and write up.
    • Capture
      • Meeting on Friday with Colin and KL to discuss R&D plan.
      • KL: Arranging meeting to coordinate the work.
    • Beam transport
      • WS: Updating Stage 1 design to get alpha to 0.
        • Couldn't find solution.
        • Lattice CCAP-v5 gives an elliptical beam in the end station.
        • Looked at updating previous lattices.
        • Using octopole after lens 5 (which now must be a solenoid) gives a more uniform distribution.
      • AK to arrange meeting to discuss writing up.
      • HTL:
        • JPas looked at HTL's design in BeamOptics. Beta was getting very small in places.
        • Looking for new solution to avoid this. Found minimum beta of about 1cm but this may still have problems with space charge.
        • HTL to look at simulating this using GPT.
    • End stations - JPar
      • Waiting on finalising the beam line before updating floor plan.
      • Discussed R&D plan. For the end stations that is automation of placing samples in the beam line.
      • Collaboration with Birmingham. Currently looking for space to build lab there.
      • Will do preliminary flash research in the next few weeks
      • Kristoffer Petersson, now at Oxford was Lausanne, working on FLASH. Look to collaborate. They have a flash electron machine, which would complement our protons.
      • Will hopefully go to Manchester on the 5th March.
    • Infrastructure and integration - GA
      • Updates to layout waiting on design being finalised.
      • Started writing.
      • Spoke to CLF. Have a paragraph on safety from them. References to existing lasers. Other issues will be solved with EPAC.
        • CLF mentioned shielding should be between target and laser room to allow work on the laser outside the radiation area.
      • Progress with costing. Should have something to circulate on Monday.
      • GA to circulate template spreadsheet for costing to WPMs.
    • Instrumentation.
    • R&D plan
      • Meetings with WPMs to update details.
      • Should be completed Monday next week.
    • Write up
      • Review write up in Tuesday meeting next week.

Action items

  • JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
  • AK to arrange meeting with OE and ZN to discuss R&D plan and write up.
  • GA to circulate template spreadsheet for costing to WPMs.
  • AK to circulate detailed R&D plan and schedule.