Changes between Version 39 and Version 40 of Research/DesignStudy/PreCDR/Review
- Timestamp:
- Mar 30, 2020, 12:30:17 PM (5 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/DesignStudy/PreCDR/Review
v39 v40 35 35 ||14:20—14:40 || C. Whyte (Strathclyde) || Proton and ion capture ([raw-attachment:05-LhARA_PPR_Whyte_20_03_30.pdf PDF]) || 36 36 ||14:40—15:00 || J. Pasternak (ICL) || Design of the LhARA accelerator facility || 37 ||15:00—15:20 || W. Shields (RHUL) || Simulation of LhARA ([raw-attachment: WShields_LhARA_Simulations.pdf PDF]) ||37 ||15:00—15:20 || W. Shields (RHUL) || Simulation of LhARA ([raw-attachment:07-WShields_LhARA_Simulations.pdf PDF]) || 38 38 ||15:20—15:40 || J. Matheson (STFC RAL, PPD) || Instrumentation || 39 39 ||15:40—16:00 || J. Hughes (Liverpool) || Biological end stations ([raw-attachment:09-JH-BES-preCDR-Meeting-310320-1.pptx PPTX], [raw-attachment:09-JH-BES-preCDR-Meeting-310320-1.pdf PDF]) ||