Version 39 (modified by 5 years ago) ( diff ) | ,
---|
Pre-publication review of the LhARA pre-CDR
The availability of the reviewers has dictated that the review will take place in two parts. On the 25th March 2020 a review of the radiobiological aspects of the LhARA programme will take place. The review of the source, accelerator, instrumentation, and project aspects will take place on the 31st March 2029.
The terms of reference for the review can be found below.
Reviewers:
Paul Bolton; Munich
Mike Lamont; CERN
Yolanda Prezado; Curie Institute, Paris
Francesco Romano; INFN
Venue
The review will be conducted as a sequence of video conferences as a result of the travel restrictions imposed to combat the spread of Covid-19. purely by video conferencing using Zoom. Connection details can be found below.
Draft document
The updated draft of the LhARA pre-CDR (draft 2.0) can be found here.
[Draft 1.0, released for the review meeting on the 24Mar20 may be found here.]
Y. Prezado's evaluation of LhARA following the review meeting on the 24th March 2020
- Prezado's evaluation of the LhARA project may be found here.
Agenda 31st March 2020
Time* | Speaker | Title |
---|---|---|
12:00—12:30 | Reviewers and PIs | Clarifications, administrative issues, and organisation |
12:30—12:45 | All | Assemble and contingency |
12:45—13:00 | K. Long (ICL) | Welcome and introduction (PPTX, PDF) |
13:00—13:25 | J. Parsons(Liverpool) | Radiobiological motivation and feedback from Y. Prezado |
13:35—13:55 | A. Kurup, pre-CDR PM (ICL) | LhARA pre-CDR overview (PPTX, PDF) |
13:55—14:00 | All | Contingency |
14:00—14:20 | O. Ettlinger (ICL) | Laser driven proton and ion source (PDF) |
14:20—14:40 | C. Whyte (Strathclyde) | Proton and ion capture (PDF) |
14:40—15:00 | J. Pasternak (ICL) | Design of the LhARA accelerator facility |
15:00—15:20 | W. Shields (RHUL) | Simulation of LhARA (PDF) |
15:20—15:40 | J. Matheson (STFC RAL, PPD) | Instrumentation |
15:40—16:00 | J. Hughes (Liverpool) | Biological end stations (PPTX, PDF) |
16:00—16:20 | G. Aymar (STFC RAL, ISIS) | Infrastructure considerations (PPTX, PDF) |
16:20—16:30 | All | Contingency |
16:30—17:00 | Reviewers | Discussion |
17:00—17:30 | All | Feedback and close-out |
* Times are to be understood to include 5 minutes for questions.
Agenda 25th March 2020
Time* | Speaker | Title |
---|---|---|
14:00—14:15 | K. Long (ICL) | Introduction (PPTX, PDF) |
14:15—14:50 | J. Parsons (Liverpool) | The motivation for LhARA (PPTX, PDF) |
14:50—15:10 | A. Kurup (ICL) | Overview of the LhARA facility (PPTX,PDF) |
15:10—16:30 | All | Discussion |
16:30—17:00 | Y. Prezado (Curie Institute) | Conclusions and close-out |
* Times are to be understood to include 5 minutes for questions.
Administration
- Terms of reference
- For the reviewers: Expense claim form
Zoom details
https://cern.zoom.us/j/941549432?pwd=VjVpb01FSHIrdVRWTTJhVklEVXdyQT09
Meeting ID: 941 549 432 Password: 646820
One tap mobile
+41432107042,,941549432# Switzerland +41432107108,,941549432# Switzerland
Dial by your location
+41 43 210 70 42 Switzerland +41 43 210 71 08 Switzerland +41 31 528 09 88 Switzerland +33 1 7037 9729 France +33 7 5678 4048 France +33 1 7037 2246 France Meeting ID: 941 549 432 Find your local number: https://cern.zoom.us/u/a2rZwec54
Join by SIP
941549432@zoomcrc.com
Join by H.323
162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India Mumbai) 115.114.115.7 (India Hyderabad) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 941 549 432 Password: 646820
Attachments (32)
- 2020-03-09-LhARAR-preCDR-Review-ToR-final.pdf (56.6 KB ) - added by 5 years ago.
- ExpenseClaim2020.xls (115.5 KB ) - added by 5 years ago.
- 2020-03-24-LhARA_pre_CDR-d1.0.pdf (19.6 MB ) - added by 5 years ago.
- 01-2020-03-25-LONG-Intro.pptx (4.9 MB ) - added by 5 years ago.
- 01-2020-03-25-LONG-Intro.pdf (4.6 MB ) - added by 5 years ago.
- pre-CDR-Radiobiology-Motivation-March-2020.pdf (2.6 MB ) - added by 5 years ago.
- pre-CDR-Radiobiology-Motivation-March-2020.pptx (2.8 MB ) - added by 5 years ago.
- 2020-03-25-Kurup.pptx (1.6 MB ) - added by 5 years ago.
- 2020-03-25-Kurup.pdf (1.3 MB ) - added by 5 years ago.
- 2020-03-27-review.CDR.YP.pdf (181.9 KB ) - added by 5 years ago.
- 2020-03-31-LhARA_pre_CDR-d2.0.pdf (10.6 MB ) - added by 5 years ago.
- 01-2020-03-31-LONG-Intro.pdf (3.5 MB ) - added by 5 years ago.
- 01-2020-03-31-LONG-Intro.pptx (5.0 MB ) - added by 5 years ago.
- 03-2020-03-31-Kurup.pptx (719.0 KB ) - added by 5 years ago.
- 03-2020-03-31-Kurup.pdf (1.2 MB ) - added by 5 years ago.
- 09-JH-BES-preCDR-Meeting-310320-1.pdf (1.2 MB ) - added by 5 years ago.
- 09-JH-BES-preCDR-Meeting-310320-1.pptx (2.1 MB ) - added by 5 years ago.
- 05-LhARA_PPR_Whyte_20_03_30.pdf (747.9 KB ) - added by 5 years ago.
- 10-Aymar_LhARA_STFC_Update_20200331.pptx (7.2 MB ) - added by 5 years ago.
- 10-Aymar_LhARA_STFC_Update_20200331.pdf (6.2 MB ) - added by 5 years ago.
- 04-CCAP_PreCDR_Talk_LASER.pdf (8.5 MB ) - added by 5 years ago.
- 07-WShields_LhARA_Simulations.pdf (3.4 MB ) - added by 5 years ago.
- 02-pre-CDR-Radiobiology-Motivation-March-2020.pdf (1.2 MB ) - added by 5 years ago.
- 02-pre-CDR-Radiobiology-Motivation-March-2020.pptx (2.1 MB ) - added by 5 years ago.
- 08-Lhara_Inst_v10.pdf (6.2 MB ) - added by 5 years ago.
- 08-Lhara_Inst_v10.pptx (12.0 MB ) - added by 5 years ago.
- 06-LhARA_Design_Review_31032020.pdf (2.1 MB ) - added by 5 years ago.
- 05-LhARA_PPR_Whyte_20_03_31.pdf (741.2 KB ) - added by 5 years ago.
- Lhara-Pre-CDR-Review-input-from-Bolton-03-04-20.pdf (72.2 KB ) - added by 5 years ago.
- LhARA-review-v7-March-2020-Draft.pdf (161.6 KB ) - added by 5 years ago.
- 2020-04-10-LhARA-review-summary.pdf (173.0 KB ) - added by 5 years ago.
- 2020-04-10-LhARA-review-summary-final.pdf (193.7 KB ) - added by 5 years ago.
Download all attachments as: .zip