Changes between Version 2 and Version 3 of Research/DesignStudy/WPMGroup/Meetings/2022/04-19
- Timestamp:
- Apr 19, 2022, 11:56:31 AM (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/DesignStudy/WPMGroup/Meetings/2022/04-19
v2 v3 11 11 12 12 1. ** Preparation of LhARA proposal ** 13 - Skeleton and planning: K. Long 14 - KL made significant proof-reading pass. 15 - CW WP1 near complete - proof-reading still required 16 17 - What we've agreed: \\ 13 18 14 Assume money from UKRI IAC proposal can start 01Oct22; then: 19 * Completed text: 08Apr22 20 * Circulate to collaboration for comment with 1 week deadline; 15 * Completed text: 08Apr22 - partial success 16 * Circulate to collaboration for comment with 1 week deadline; - action completed K. Long Thurs 14th April 21 17 * Finalised document by 22Apr22 \\ 22 18 This gives 1 week contingency before collaboration meeting 23 19 - Work package reports: 24 1. Project Management: J. Parsons, C. Whyte 25 2. Laser-driven source: E. Boella, N. Dover, R. Gray 20 1. Project Management: J. Parsons, C. Whyte. 21 * Major project deliverables 22 * CDR 24 23 * TDR1 36 24 * TDR2 60 25 26 2. Laser-driven source: E. Boella, N. Dover, R. Gray 27 * Major project deliverables 28 * Scapa ion source sim & expt 18 29 * Optimisation of proton and Ion source - laser specifiction 30 30 * 10Hz operation - advanced targetry 48 31 * Stabilised 5Hz at Scapa 59 32 26 33 3. Ion capture: M. Charlton, W. Bertsche 34 35 * Major project deliverables 36 * Validate plasma Sims 6 37 * Larga diameter plasma expt results 18 38 * Next generation plasma lens design 23 39 * Build progress report 36 40 * Ion focussing results 59 41 27 42 4. Dose-deposition profiling: J. Bamber, E. Harris, J. Mattheson 43 44 * Major project deliverables 45 * Geant 4 Sims 12 46 * K-wave simulation and sensor array design 23 47 * Iterative reconstruction methods 36 48 * Dose mapping - calibration of ion acoustic detection 48 49 * Acoustic rig/radiobiology station integration 48 50 * 'LhARA' test results 59 51 28 52 5. Vertical beam line and biological end station development: R. McLauchlan, T. Price 53 54 * Major project deliverables 55 * Report on required new beam monitoring required 23 56 * Design report: automated handling facility 23 57 * Report: beam monitoring system 59 58 * Specification, LhARA beam delivery and monitoring system 59 59 60 29 61 6. Accelerator design and integration: N. Bliss, J. Pasternak 62 63 * Major project deliverables 64 * Final review R&D for CDR 18 65 * Final review R&D for TDR1 35 66 * Final review R&D for TDR2 56 67 * Technical review FFA magnet 58 68 * Technical review MA cavity 58 30 69 31 70 2. ** DoNM **: