Changes between Version 2 and Version 3 of Research/DesignStudy/WPMGroup/Meetings/2022/04-19


Ignore:
Timestamp:
Apr 19, 2022, 11:56:31 AM (3 years ago)
Author:
cwhyte1
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/WPMGroup/Meetings/2022/04-19

    v2 v3  
    1111
    12121. ** Preparation of LhARA proposal **
    13  - Skeleton and planning: K. Long
    14   - KL made significant proof-reading pass.
    15   - CW WP1 near complete - proof-reading still required 
    16 
    17   - What we've agreed: \\
     13 
    1814   Assume money from UKRI IAC proposal can start 01Oct22; then:
    19     * Completed text: 08Apr22
    20     * Circulate to collaboration for comment with 1 week deadline;
     15    * Completed text: 08Apr22 - partial success
     16    * Circulate to collaboration for comment with 1 week deadline; - action completed K. Long Thurs 14th April
    2117    * Finalised document by 22Apr22 \\
    2218   This gives 1 week contingency before collaboration meeting
    2319 - Work package reports:
    24   1. Project Management: J. Parsons, C. Whyte
    25   2. Laser-driven source: E. Boella, N. Dover, R. Gray
     20  1. Project Management: J. Parsons, C. Whyte.
     21* Major project deliverables 
     22* CDR    24
     23* TDR1   36
     24* TDR2   60
     25
     26  2. Laser-driven source: E. Boella, N. Dover, R. Gray
     27* Major project deliverables 
     28* Scapa ion source sim & expt                                   18
     29* Optimisation of proton and Ion source - laser specifiction    30
     30* 10Hz operation - advanced targetry                            48
     31* Stabilised 5Hz at Scapa                                       59
     32
    2633  3. Ion capture: M. Charlton, W. Bertsche
     34
     35* Major project deliverables 
     36* Validate plasma Sims                                           6
     37* Larga diameter plasma expt results                            18
     38* Next generation plasma lens design                            23
     39* Build progress report                                         36
     40* Ion focussing results                                         59
     41
    2742  4. Dose-deposition profiling: J. Bamber, E. Harris, J. Mattheson
     43
     44* Major project deliverables 
     45* Geant 4 Sims                                                  12
     46* K-wave simulation and sensor array design                     23
     47* Iterative reconstruction methods                              36
     48* Dose mapping - calibration of ion acoustic detection          48
     49* Acoustic rig/radiobiology station integration                 48
     50* 'LhARA' test results                                          59
     51
    2852  5. Vertical beam line and biological end station development: R. McLauchlan, T. Price
     53
     54* Major project deliverables 
     55* Report on required new beam monitoring required               23
     56* Design report: automated handling facility                    23
     57* Report: beam monitoring system                                59
     58* Specification, LhARA beam delivery and monitoring system      59
     59
     60
    2961  6. Accelerator design and integration: N. Bliss, J. Pasternak
     62
     63* Major project deliverables 
     64* Final review R&D for CDR                                      18
     65* Final review R&D for TDR1                                     35
     66* Final review R&D for TDR2                                     56                           
     67* Technical review FFA magnet                                   58
     68* Technical review MA cavity                                    58
    3069
    31702. ** DoNM **: