wiki:Research/DesignStudy/WPMGroup/Meetings/2022/05-05WP4

Agenda

  1. Cost
  • Travel £26k
  1. Milestones
  • M4.1 Geant4 simulations of bema energy deposition profile M18
  • M4.2 Acoustic sensor array design M24
  • M4.3 Iterative reconstruction methods M42
  • M4.4 Integration:ultra-sonic array with radiobiology station M48
  • M4.5 LhARA ion-acoustic test results M60
  1. Risk
  1. AOB
Last modified 2 years ago Last modified on May 5, 2022 11:25:50 AM