LhARA Capture meeting: 10MAR22; 16:00 BST
Present: CB(Chair), KL, BB, TD, EB, CW, MC. Apologies: AK
Notes
*EB: supervising student working on PIC simulations of co-propagating electrons - update in due course
*CB: ITRF 'hard' costs still unknown, but expected soon. Proposal to be updated soon afterward to meet set deadlines.
*As TD gave simulation update at recent fortnightly meeting, and detailed update of Capture WP expected at collaboration meeting, options discussed for 19Apr22 scientific contribution
*EB source simulation update potentially on 5Apr22
*As still no license for VSim available, no simulation update from TD
*TD abstract and oral presentation at IOP HEPP conference accepted
*Current Swansea solenoid issues discussed
*Consensus to accept as-is (i.e is 10% low, in accordance with TD simulations, models, and CB measurements)
*Further testing possible, but not worth much effort
*MC updates design paper contribution is progressing well
*Doodle poll live for new 1/2-day discussion
*HT completion discussed
Summary of actions:
*KL to chase ND for slides - Done
*Doodle poll for 1/2-day to be completed - All
*Consider capture proposal update presentation on 19Apr22 - CB
*Send contributions to CB when ready - TD
Agenda
- Introduction, notes and actions: Chair/All
- Update on the results of simulations: TD
- Update on Experimental components: CB
- Update on Progress Paper: MC
- AOB: All
Connection details
Join Zoom Meeting: https://cern.zoom.us/j/68763369382?pwd=V05jYjM0MHNTeHFwQjdYbG1hSDhPdz09