|  | 2 |  | 
          
            |  | 3 | == Notes: == | 
          
            |  | 4 |  | 
          
            |  | 5 | **Present*: KL, HTL | 
          
            |  | 6 |  | 
          
            |  | 7 | 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/09-13 last meeting]: | 
          
            |  | 8 | * **KL**: Liaise to develop concept for polishing. | 
          
            |  | 9 | * **Ongoing**. | 
          
            |  | 10 | * **KL**: Define light exclusion scheme for 527. | 
          
            |  | 11 | * **Done**.  Progress since last week: occupants of offices beyond the 527 lab informed and on-board with need to exclude short-wavelength light.  OK now to plan to do the "yellow out".  Specification of material sourced by AK passed on to KL. | 
          
            |  | 12 | * **AK**: Prepare paperwork necessary to gain permission to work with source in 527. | 
          
            |  | 13 | * **Ongoing.** | 
          
            |  | 14 | * **AK**: Pass details of second laptop to KL so that delivery can be followed in AK's absense. | 
          
            |  | 15 | * **Superceded**.  Laptop has now arrived.  LabView installed (i.e. Licences are valid). | 
          
            |  | 16 |  | 
          
            |  | 17 | 2. Baseline schedule and progress against schedule: KL/HTL \\ | 
          
            |  | 18 | * [raw-attachment:2019-08-21-SmartPhantom.pdf Progress against baseline schedule]. | 
          
            |  | 19 |  | 
          
            |  | 20 | 3. Mechanical design/manufacture update: JT for LC \\ | 
          
            |  | 21 | * Winding jig is complete at RAL and will be shipped to imperial.  Photograph of assembled jig is shown below. | 
          
            |  | 22 |  | 
          
            |  | 23 | 4. Control system and SciWire readout update: AK \\ | 
          
            |  | 24 | * No report this week as AK is on leave.  Item left for future reference. | 
          
            |  | 25 |  | 
          
            |  | 26 | 5. Simulation/analysis update: HTL \\ | 
          
            |  | 27 | * [raw-attachment:meeting.pdf Material/Glue Simulation Update]. | 
          
            |  | 28 | * Variation with film material (mylar, kevlar, and kapton) and depth of epoxy studied.  Variation is small.  So we **accept** specification adopted in discussion on 15Aug19: 100 micron mylar sheet and 200 micron depth of epoxy. | 
          
            |  | 29 |  | 
          
            |  | 30 | 6. Next steps \\ | 
          
            |  | 31 | * Move to test winding. | 
          
            |  | 32 |  | 
          
            |  | 33 | 7. DONM \\ | 
          
            |  | 34 | * 28Aug19 | 
          
            |  | 35 |  | 
          
            |  | 36 | 8. AoB \\ | 
          
            |  | 37 |  | 
          
            |  | 38 | === Summary of actions: === | 
          
            |  | 39 | * **KL**: Liaise to develop concept for polishing. | 
          
            |  | 40 | * **AK**: Prepare paperwork necessary to gain permission to work with source in 527. | 
          
            |  | 41 |  | 
          
            |  | 42 | ---- |