wiki:Research/Instrumentation/Meetings/2019/08-21

Version 8 (modified by longkr, 5 years ago) ( diff )

--

SmartPhantom meeting: Wednesday 21st August 2019, 11:00 BST

Notes:

Present*: KL, HTL

  1. Notes and actions from last meeting:
    • KL: Liaise to develop concept for polishing.
      • Ongoing.
    • KL: Define light exclusion scheme for 527.
      • Done. Progress since last week: occupants of offices beyond the 527 lab informed and on-board with need to exclude short-wavelength light. OK now to plan to do the "yellow out". Specification of material sourced by AK passed on to KL.
    • AK: Prepare paperwork necessary to gain permission to work with source in 527.
      • Ongoing.
    • AK: Pass details of second laptop to KL so that delivery can be followed in AK's absense.
      • Superceded. Laptop has now arrived. LabView installed (i.e. Licences are valid).
  1. Baseline schedule and progress against schedule: KL/HTL
  1. Mechanical design/manufacture update: JT for LC
    • Winding jig is complete at RAL and will be shipped to imperial. Photograph of assembled jig is shown below.
  1. Control system and SciWire readout update: AK
    • No report this week as AK is on leave. Item left for future reference.
  1. Simulation/analysis update: HTL
    • Material/Glue Simulation Update.
    • Variation with film material (mylar, kevlar, and kapton) and depth of epoxy studied. Variation is small. So we accept specification adopted in discussion on 15Aug19: 100 micron mylar sheet and 200 micron depth of epoxy.
  1. Next steps
    • Move to test winding.
  1. DONM
    • 28Aug19
  1. AoB

Summary of actions:

  • KL: Liaise to develop concept for polishing.
  • AK: Prepare paperwork necessary to gain permission to work with source in 527.

Meeting details

Blackett 521 (The Tutorial Room) and teleconference

Phone details:

  UK: 08082 380274
  Austria: 0800 006612 

  PIN: 5904750902

Full list of telephone contacts may be found here.


Agenda:

  1. Notes and actions from last meeting:
    • KL: Liaise to develop concept for polishing.
      • Ongoing.
    • KL: Define light exclusion scheme for 527.
      • Done. Progress since last week: occupants of offices beyond the 527 lab informed and on-board with need to exclude short-wavelength light. OK now to plan to do the "yellow out". Specification of material sourced by AK passed on to KL.
    • AK: Prepare paperwork necessary to gain permission to work with source in 527.
      • Ongoing.
    • AK: Pass details of second laptop to KL so that delivery can be followed in AK's absense.
      • Superceded. Laptop has now arrived.
  1. Baseline schedule and progress against schedule: KL/HTL
  1. Mechanical design/manufacture update: JT for LC
  1. Control system and SciWire readout update: AK
    • No report this week as AK is on leave. Item left for future reference.
  1. Simulation/analysis update: HTL
  1. Next steps
  1. DONM
    • 28Aug19
  1. AoB

Attachments (2)

Download all attachments as: .zip

Note: See TracWiki for help on using the wiki.