Version 3 (modified by 5 years ago) ( diff ) | ,
---|
SmartPhantom meeting: Wednesday 21st August 2019, 11:00 BST
Meeting details
Blackett 521 (The Tutorial Room) and teleconference
Phone details:
UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902
Full list of telephone contacts may be found here.
Agenda:
- Notes and actions from last meeting:
- KL: Liaise to develop concept for polishing.
- Ongoing.
- KL: Define light exclusion scheme for 527.
- Done. Progress since last week: occupants of offices beyond the 527 lab informed and on-board with need to exclude short-wavelength light. OK now to plan to do the "yellow out". Specification of material sourced by AK passed on to KL.
- AK: Prepare paperwork necessary to gain permission to work with source in 527.
- Ongoing.
- AK: Pass details of second laptop to KL so that delivery can be followed in AK's absense.
- Superceded. Laptop has now arrived.
- KL: Liaise to develop concept for polishing.
- Baseline schedule and progress against schedule: KL/HTL
- Mechanical design/manufacture update: JT for LC
- Control system and SciWire readout update: AK
- No report this week as AK is on leave. Item left for future reference.
- Simulation/analysis update: HTL
- Next steps
- DONM
- 28Aug19
- AoB
- None.
Attachments (2)
- meeting.pdf (1.3 MB ) - added by 5 years ago.
- 2019-08-21-SmartPhantom.pdf (24.9 KB ) - added by 5 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.