    77Phone details:
    88{{{
    9 UK: 08082 380274
    10 Austria: 0800 006612
     9  UK: 08082 380274
     10  Austria: 0800 006612
    1111
    12 PIN: 5904750902
     12  PIN: 5904750902
    1313
    1414}}}
     
    2020== Agenda: ==
    2121
    22 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/09-06 last meeting]:
     221. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/08-06 last meeting]:
    2323 * **KL**: Liaise to develop concept for polishing.
     24  * **Ongoing.** Keep action to make sure it stays in our minds.
    2425 * **KL**: Define light exclusion scheme for 527.
     26  * **Ongoing.** Will use conbination of plastic covers.  Need to liaise with occupants of 527 and the offices next door.
    2527 * **KL**: Inform MP of present design of support mechanism and discuss/identify any issues.
     28 * **Done.** AK, HTL, and KL met MP on 13Aug19.  The scheme proposed by LC was discussed and accepted in principle.  It was //agreed// to propose the following modifications to LC:
     29  * Station 1 (counting from the beam direction) should be mounted independently so that it remains in a fixed, reference location during the exposures.
     30  * Stations 2 to 5 (assuming we use 5) should be mounted separately with a mounting arrangement that allows the required variety of positions to be used.
     31  * The mounting scheme needs also to have some fixing mechanism.
    2632 * **AK**: Prepare paperwork necessary to gain permission to work with source in 527.
     33  * **Ongoing.** AK has been liasing with the RPA at Imperial to generate the necessary paper work.
    2734
    28352. Baseline schedule and progress against schedule: HTL \\