     1= SmartPhantom meeting: Tuesday 24^th^ September 2019, 11:30 BST =
     2
     3== Meeting details ==
     4
     5Venue: my apologies; I did not book a room at Imperial!
     6 Perhaps JB, AK, and HTL et al can work out a convenient common location.
     7
     8Phone details:
     9{{{
     10  UK: 08082 380274
     11  Austria: 0800 006612
     12
     13  PIN: 5904750902
     14
     15}}}
     16
     17Full list of telephone contacts may be found [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Communication/Z0-Phone-details.pdf here].
     18
     19----
     20
     21== Agenda: ==
     22
     231. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/09-18 last meeting]:
     24 * **KL**: Liaise to develop concept for polishing.
     25 * **KL**: Prepare revision to schedule for the next meeting.
     26 * **KL,AK,HTL**: Consult to specify the data recording at MedAustron.
     27 * **AK**: Invent a note numbering scheme so that HTL's note can be "published" on the wiki as a CCAP note.
     28 * **HTL**: Add CCAP note number to the header of the note and post it as a CCAP note.
     29 * **KL**: Email D.Nardini and I.Clark to explain the teh next steps in the programme and to request machining of carbon fibre (two frames, two connector strips).
     30 * **AK**: Purchase hard-drive to store SmartPhantom data in operation.
     31 * **KL or HTL**: Transport optical components from Imperial to RAL (LC).
     32 * **LC**: Complete detailed design of the boot.
     33 * **KL**: Send fibre invoices to HTL.
     34 * **HTL**: Provide spreadsheet with revised, precise estimate of fibre cost.
     35 * **KL**: Prepare a revised costing spreadsheet for next meeting.
     36
     372. Baseline schedule and progress against schedule: KL/HTL \\
     38
     393. Mechanical design/manufacture update: LC \\
     40
     414. Control system and SciWire readout update: AK \\
     42
     435. Optical readout: JB \\
     44
     456. Simulation/analysis update: HTL \\
     46
     477. Spend status, discussion of outstanding requirement: KL/All \\
     48
     498. Next steps: All \\
     50 
     519. DONM \\
     52
     5310. AoB \\
     54
     55----