| 2 | |
| 3 | == Notes: == |
| 4 | |
| 5 | **Present:** JB, KL, HTL, LC |
| 6 | |
| 7 | 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/09-24 last meeting]: |
| 8 | * **KL**: Liaise to develop concept for polishing. |
| 9 | * **Stands.** |
| 10 | * **KL**: Prepare revision to schedule for the next meeting. |
| 11 | * **Stands.** Agenda item. |
| 12 | * **KL,AK,HTL**: Consult to specify the data recording at MedAustron. |
| 13 | * **Done.** We propose: |
| 14 | * We get a trigger from the `machine start' from the synchrotron at MedAustron. Implies we need to know the signal type and convert as necessary. |
| 15 | * We then run the cameras in ‘video camera’ mode; |
| 16 | * We start the readout after a delay to be determined. The delay needs to be such that the cameras start to run ‘just before’ the beam arrives. |
| 17 | * **Agreed.** |
| 18 | * **AK**: Invent a note numbering scheme so that HTL's note can be "published" on the wiki as a CCAP note. |
| 19 | * **Stands.** Probably can discuss with HTL and (to coin a phrase) get it done! |
| 20 | * **HTL**: Add CCAP note number to the header of the note and post it as a CCAP note. |
| 21 | * **Stands.** |
| 22 | * **AK**: Purchase hard-drive to store SmartPhantom data in operation. |
| 23 | * **Stands.** |
| 24 | * **KL or HTL**: Transport optical components from Imperial to RAL (LC). |
| 25 | * **Done.** |
| 26 | * **LC**: Complete detailed design of the boot. |
| 27 | * **Stands/Done.** |
| 28 | * **KL**: Prepare a revised costing spreadsheet for next meeting. |
| 29 | * **Stands.** Agenda item. |
| 30 | * **KL**: Initiate discussion of of visit to MedAustron to review SmartPhantom design. |
| 31 | * **Done.** Doodle at: https://www.doodle.com/poll/5fiyyik88s78tpty |
| 32 | |
| 33 | 2. Baseline schedule and progress against schedule: KL/HTL \\ |
| 34 | * Some uncertainties in the timetable now since we need to revise the design. Need to make a revision for the next meeting. |
| 35 | |
| 36 | 3. Mechanical design/manufacture update: LC \\ |
| 37 | [raw-attachment:SmartPhantom_PrototypeUpdate.pdf Prototype Update.] |
| 38 | No additional notes. |
| 39 | |
| 40 | 4. Control system and SciWire readout update: AK \\ |
| 41 | No report this week. |
| 42 | |
| 43 | 5. Optical readout: JB \\ |
| 44 | No update this week. |
| 45 | |
| 46 | 6. Simulation/analysis update: HTL \\ |
| 47 | [raw-attachment:SmartPhantom_Meeting.pdf Preliminary Sr-90 Simulation.] |
| 48 | Photon rate seems acceptable. Agree to set-up a test to check light from single fibre. |
| 49 | |
| 50 | 7. Spend status, discussion of outstanding requirement: KL/All \\ |
| 51 | No additional items discussed. As for schedule, need to make a revision for the next meeting. |
| 52 | |
| 53 | 8. Next steps: All \\ |
| 54 | * Black out 527 at Imperial. |
| 55 | * Polishing test. |
| 56 | * Finalise boot design. |
| 57 | * Work to produce two more stations. |
| 58 | |
| 59 | 9. DONM \\ |
| 60 | 09Oct19 |
| 61 | |
| 62 | 10. AoB \\ |
| 63 | None. |
| 64 | |
| 65 | ---- |