Changes between Version 4 and Version 5 of Research/Instrumentation/Meetings/2019/10-02


Ignore:
Timestamp:
Oct 16, 2019 9:54:52 AM (4 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/Instrumentation/Meetings/2019/10-02

    v4 v5  
    11= SmartPhantom meeting: Wednesday 2^nd^ October 2019, 11:00 BST =
     2
     3== Notes: ==
     4
     5**Present:** JB, KL, HTL, LC
     6
     71. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/09-24 last meeting]:
     8 * **KL**: Liaise to develop concept for polishing.
     9  * **Stands.**
     10 * **KL**: Prepare revision to schedule for the next meeting.
     11  * **Stands.** Agenda item.
     12 * **KL,AK,HTL**: Consult to specify the data recording at MedAustron.
     13  * **Done.** We propose:
     14   * We get a trigger from the `machine start' from the synchrotron at MedAustron.  Implies we need to know the signal type and convert as necessary.
     15   * We then run the cameras in ‘video camera’ mode;
     16   * We start the readout after a delay to be determined.  The delay needs to be such that the cameras start to run ‘just before’ the beam arrives.
     17  * **Agreed.**
     18 * **AK**: Invent a note numbering scheme so that HTL's note can be "published" on the wiki as a CCAP note.
     19  * **Stands.** Probably can discuss with HTL and (to coin a phrase) get it done!
     20 * **HTL**: Add CCAP note number to the header of the note and post it as a CCAP note.
     21  * **Stands.**
     22 * **AK**: Purchase hard-drive to store SmartPhantom data in operation.
     23  * **Stands.**
     24 * **KL or HTL**: Transport optical components from Imperial to RAL (LC).
     25  * **Done.**
     26 * **LC**: Complete detailed design of the boot.
     27  * **Stands/Done.**
     28 * **KL**: Prepare a revised costing spreadsheet for next meeting.
     29  * **Stands.**  Agenda item.
     30 * **KL**: Initiate discussion of of visit to MedAustron to review SmartPhantom design.
     31  * **Done.** Doodle at: https://www.doodle.com/poll/5fiyyik88s78tpty
     32
     332. Baseline schedule and progress against schedule: KL/HTL \\
     34 * Some uncertainties in the timetable now since we need to revise the design.  Need to make a revision for the next meeting.
     35
     363. Mechanical design/manufacture update: LC \\
     37   [raw-attachment:SmartPhantom_PrototypeUpdate.pdf Prototype Update.]
     38   No additional notes.
     39
     404. Control system and SciWire readout update: AK \\
     41 No report this week.
     42 
     435. Optical readout: JB \\
     44 No update this week.
     45
     466. Simulation/analysis update: HTL \\
     47   [raw-attachment:SmartPhantom_Meeting.pdf Preliminary Sr-90 Simulation.]
     48   Photon rate seems acceptable.  Agree to set-up a test to check light from single fibre.
     49   
     507. Spend status, discussion of outstanding requirement: KL/All \\
     51   No additional items discussed.  As for schedule, need to make a revision for the next meeting.
     52
     538. Next steps: All \\
     54 * Black out 527 at Imperial.
     55 * Polishing test.
     56 * Finalise boot design.
     57 * Work to produce two more stations.
     58
     599. DONM \\
     60 09Oct19
     61 
     6210. AoB \\
     63 None.
     64 
     65----