Version 1 (modified by 5 years ago) ( diff ) | ,
---|
SmartPhantom meeting: Wednesday 9th October 2019, 11:00 BST
Meeting details
Venue: my office: 1105 Blackett Laboratory. Phone details:
UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902
Full list of telephone contacts may be found here.
Agenda:
- Notes and actions from last meeting:
- KL: Liaise to develop concept for polishing. Ongoing. Attempt made using 'fishing-line prototypes' at Imperial. Poor finish; some tearing of fibres. Noted that the superglue was brittle and probably its solvents were damaging for fibre. So, avoid in future. In discussion we agreed to make a 1mm recess so that fibres can be potted in resin. This will allow the fibres to be supported during machining.
- KL: Prepare revision to schedule for the next meeting.
- Stands. Agenda item.
- AK: Invent a note numbering scheme so that HTL's note can be "published" on the wiki as a CCAP note.
- Done.
- Categories (list can be extended as required):
- Radiobiology
- Accelerator
- Instrumentation
- Other
- e.g. civil engineering
- Numbering: CCAP-TN-{RBIO,ACCL,INST,MISC}-xx
- Categories (list can be extended as required):
- Done.
- HTL: Add CCAP note number to the header of the note and post it as a CCAP note.
- Stands.
- AK: Purchase hard-drive to store SmartPhantom data in operation.
- Stands.
- LC: Complete detailed design of the boot.
- Stands/agenda item.
- KL: Prepare a revised costing spreadsheet for next meeting.
- Stands. Agenda item.
- Mechanical design/manufacture update: LC
- Single-fibre test setup: HTL
- Schedule revision discussion: All
- Spend: outstanding requirement: All
- Visit to MedAustron: All
- Next steps: All
- DONM
- AoB
Note:
See TracWiki
for help on using the wiki.