| 1 | = SmartPhantom meeting: Wednesday 23^rd^ October 2019, 11:00 BST = |
| 2 | |
| 3 | == Notes: == |
| 4 | |
| 5 | 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/10-16 last meeting]: |
| 6 | * **KL**: Liaise to develop concept for polishing. |
| 7 | * **Stands**. |
| 8 | * **HTL**: Prepare revision to schedule for the next meeting. |
| 9 | * **Done**. Agenda item. |
| 10 | * **HTL**: Prepare a revised costing spreadsheet for next meeting. |
| 11 | * **Done**. Agenda item. |
| 12 | * **HTL**: Add CCAP note number to the header of the note and post it as a CCAP note. |
| 13 | * **Stands**. |
| 14 | * **AK**: Purchase hard-drive to store SmartPhantom data in operation. |
| 15 | * **Done**. Order placed |
| 16 | * **LC**: Complete detailed design of the boot. |
| 17 | * **Stands**. Agenda itme. |
| 18 | |
| 19 | 2. Mechanical design/manufacture update: LC \\ |
| 20 | * LC reported on the [raw-attachment:2019-10-22-LC-report.pdf Potting figures]. |
| 21 | * LC has discussed his boot concept with Cyril. Concept is to restrain resin with release tape. KL noted that for MICE a 'reservoire' of resin was created by drilling an oversize hole on the 'reverse' side of the boot. LC will also consider this. |
| 22 | * LC has sent a drawing update has been done and sent to D.Nardini. DN is awaiting material (2mm cf sheet). |
| 23 | * JB noted that we would also require a camera enclosure and transport case. |
| 24 | |
| 25 | 3. Single-fibre test setup: HTL \\ |
| 26 | * Preparation for set-up has been completed in 527 Blackett. Some parts manufactured, still awaiting source holder a design for which had been provided to DN by HTL. |
| 27 | * Boot design has been transmitted to DN (has also been manufactured). |
| 28 | |
| 29 | 4. Schedule revision discussion: All \\ |
| 30 | * Revised schedule presented. End-date looks rather too late. Need to press on next prototype. |
| 31 | |
| 32 | 5. Spend: outstanding requirement: All \\ |
| 33 | * Revised spend presented. Close to break even. Can purchase enough fibre for single layer planes. |
| 34 | * Need to make orders asap. |
| 35 | |
| 36 | 6. Visit to MedAustron: All \\ |
| 37 | * **KL:** Needs to confirm detail with M.Puchalska. |
| 38 | |
| 39 | 7. Next steps: All \\ |
| 40 | * Crack on with programme! |
| 41 | |
| 42 | 8. DONM \\ |
| 43 | * Meet next week 11:00 GMT; 12:00 at MedAustron. |
| 44 | * Meet at MedAustron for an 09:30 start. |
| 45 | * **KL:** Look into Vidyo, ZOOM, or Skype for this meeting. |
| 46 | |
| 47 | 9. AoB \\ |
| 48 | * None. |
| 49 | |
| 50 | ---- |
| 51 | |
| 52 | === Summary of actions: === |
| 53 | * **KL**: Liaise to develop concept for polishing. |
| 54 | * **HTL**: Add CCAP note number to the header of the note and post it as a CCAP note. |
| 55 | * **LC**: Complete detailed design of the boot. |
| 56 | * **KL:** Needs to confirm detail with M.Puchalska. |
| 57 | * **KL:** Look into Vidyo, ZOOM, or Skype for next week's meeting. |
| 58 | |
| 59 | ---- |
| 60 | |
| 61 | == Meeting details == |
| 62 | |
| 63 | Venue: my office: 1105 Blackett Laboratory. |
| 64 | |
| 65 | Phone details: |
| 66 | {{{ |
| 67 | UK: 08082 380274 |
| 68 | Austria: 0800 006612 |
| 69 | |
| 70 | PIN: 5904750902 |
| 71 | }}} |
| 72 | |
| 73 | Full list of telephone contacts may be found [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Communication/Z0-Phone-details.pdf here]. |
| 74 | |
| 75 | ---- |
| 76 | |
| 77 | == Agenda: == |
| 78 | |
| 79 | 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/10-02 last meeting]: |
| 80 | |
| 81 | 2. Mechanical design/manufacture update: LC \\ |
| 82 | |
| 83 | 3. Single-fibre test setup: HTL \\ |
| 84 | |
| 85 | 4. Schedule revision discussion: All \\ |
| 86 | |
| 87 | 5. Spend: outstanding requirement: All \\ |
| 88 | |
| 89 | 6. Visit to MedAustron: All \\ |
| 90 | |
| 91 | 7. Next steps: All \\ |
| 92 | |
| 93 | 8. DONM \\ |
| 94 | |
| 95 | 9. AoB \\ |
| 96 | |
| 97 | ---- |