Changes between Version 7 and Version 8 of Research/Instrumentation/Meetings/2019/10-30


Ignore:
Timestamp:
Oct 30, 2019 11:12:25 AM (5 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/Instrumentation/Meetings/2019/10-30

    v7 v8  
    1212 // To include: //
    1313  * Space, support for SmartPhantom and associated cameras, USB system and computer;
    14    * Support for SmartPhantom within the water phantom;
     14   * Table is large enough: 170cm x 53xm
     15  * Support for SmartPhantom within the water phantom;
     16    *
    1517   * Length of light quides and other cabling;
     18    * Table is 170cm.  ROom for electronics either side.
     19    * Centre of beam to wall is 4m -- both sides.
    1620   * Mains power and other requirements.
     21    * 220V; 50Hz; mains sockets on wall.
    1722  * Trigger signal and electrical communications:
    1823   * Position of signal, connector, cable, voltage pulse shape;
     24    * Single, long cable.  BNC connector.  Signal is 5V;
     25    * Pulse shape:
    1926   * Communication from control room to research room:
     27    * Ethernet on wall; communication via ethernet (vlan).
     28    * Laptop therefore has to be registered with MedAuxtron IT.
    2029   * E.g. ethernet cable location, length, etc.
     30    * >= 2m
     31   * Ionisatoin chamnber: ROOS Chanmber from PTW
     32  * CCTV monitoring for the set-up
    2133  * Logistics:
    2234   * What arrangements do we need to make to set up for and to execute the experiemnt?
     35    *
    2336   * Personal dosimetery for those involved.
     37    *
    2438   * Registration procedures etc.
     39    *
    2540   * RP procedures; what is required before we take SmartPhantom away.
     41    *
    2642
    27434. Summary, actions and next steps: All \\