Changes between Version 7 and Version 8 of Research/Instrumentation/Meetings/2019/10-30
- Timestamp:
- Oct 30, 2019, 11:12:25 AM (5 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/Instrumentation/Meetings/2019/10-30
v7 v8 12 12 // To include: // 13 13 * Space, support for SmartPhantom and associated cameras, USB system and computer; 14 * Support for SmartPhantom within the water phantom; 14 * Table is large enough: 170cm x 53xm 15 * Support for SmartPhantom within the water phantom; 16 * 15 17 * Length of light quides and other cabling; 18 * Table is 170cm. ROom for electronics either side. 19 * Centre of beam to wall is 4m -- both sides. 16 20 * Mains power and other requirements. 21 * 220V; 50Hz; mains sockets on wall. 17 22 * Trigger signal and electrical communications: 18 23 * Position of signal, connector, cable, voltage pulse shape; 24 * Single, long cable. BNC connector. Signal is 5V; 25 * Pulse shape: 19 26 * Communication from control room to research room: 27 * Ethernet on wall; communication via ethernet (vlan). 28 * Laptop therefore has to be registered with MedAuxtron IT. 20 29 * E.g. ethernet cable location, length, etc. 30 * >= 2m 31 * Ionisatoin chamnber: ROOS Chanmber from PTW 32 * CCTV monitoring for the set-up 21 33 * Logistics: 22 34 * What arrangements do we need to make to set up for and to execute the experiemnt? 35 * 23 36 * Personal dosimetery for those involved. 37 * 24 38 * Registration procedures etc. 39 * 25 40 * RP procedures; what is required before we take SmartPhantom away. 41 * 26 42 27 43 4. Summary, actions and next steps: All \\