Changes between Version 8 and Version 9 of Research/Instrumentation/Meetings/2019/10-30
- Timestamp:
- Oct 30, 2019, 4:29:41 PM (5 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/Instrumentation/Meetings/2019/10-30
v8 v9 1 1 = SmartPhantom meetings: Wednesday 30^th^ October 2019 = 2 2 3 There are two meetings today. The first (at 09:30 CET) will not be a teleconference. The discussion will just be between those at MedAustron. The second (at 12:00 CET) will be video-conference using the VIDYO system. 3 == Summary of actions: == 4 Moved to the top as the notes this week are rather long. 5 * **KL**: Liaise to develop concept for polishing. 6 * **LC**: Complete detailed design of the boot. 7 * **MP**: Send autocad drawing of flask holder to LC. 8 * **LC** create drawing of station-holder concept: stations fixed to culture flask and station fixed at entry to water phantom. 9 * **MP**: Provide trigger-pulse shape. 10 * **KL** deal with projected overspend on IC IAA account and estimate of resource required from PPD. 11 12 ---- 13 14 There there were two meetings today. The first (at 09:30 CET) will not be a teleconference. The discussion will just be between those at MedAustron. The second (at 12:00 CET) will be video-conference using the VIDYO system. 4 15 5 16 == 09:30 CET meeting Agenda: == 17 18 === Notes: === 6 19 7 20 1. Welcome and announcements: MP … … 9 22 2. SmartPhantom development: [raw-attachment:SmartPhantom_Status.pdf status and plans]: HTL \\ 10 23 11 3. Discussion \\24 3. Discussion (including visit to research room) \\ 12 25 // To include: // 13 26 * Space, support for SmartPhantom and associated cameras, USB system and computer; 14 * Table is large enough: 170cm x 53xm 27 * The water phantom will be placed on the treatment couch (table). The table will be arrainged such that its axis is perpendicular to the beam line. 28 * The table is 170cm long by 53cm wide. This will be large enough for the cameras and laptop to be placed next to the SmartPhantom on the table. 15 29 * Support for SmartPhantom within the water phantom; 16 * 30 * The water phantom was inspected and dimensions were measured. The manual for the SmartPhantom has been [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Research/Instrumentation/Documentation/Drawings/Water_phantom_T41023_Man_en_73813100_02.pdf posted] on the wiki. 31 * We agreed to: 32 * Mount three statons on a PMMA culture-flask holder. This has the advantage of keeping the stations strongly coupled to the culture flask. A fixed station will be installed as close as possible to the entry window, 33 * **LC** will need to make a drawing. Concept is to clampt to the material provided by the flask-support structure. 17 34 * Length of light quides and other cabling; 18 * Table is 170cm. R Oom for electronics either side.19 * Centre of beam to wall is 4m --both sides.35 * Table is 170cm. Room for cameras/USB hubs/laptop on either side. Perhaps determine length of year fibre by making a model. 36 * Centre of beam in the centre of the room ... beam-axis to wall is 4m on both sides. 20 37 * Mains power and other requirements. 21 * 2 20V; 50Hz; mains sockets on wall.38 * 230V; 50Hz; mains sockets on wall. EU style plugs. 22 39 * Trigger signal and electrical communications: 23 40 * Position of signal, connector, cable, voltage pulse shape; 24 * Single, long cable. BNC connector. Signal is 5V; 25 * Pulse shape: 26 * Communication from control room to research room: 41 * Single, long cable; 'plenty long enough'. BNC connector. Signal is 5V; 42 * Pulse shape: will be found by **MP**. 43 * JB suggested we try record trigger signals by flashing an LED and imaging the light. Resolution limited by the shutter rate. Alternative is to detect the rising edge. To avoid complication we **agree** to digitise the rising edge and record in LabView. 44 * Communication from control room for research room: 27 45 * Ethernet on wall; communication via ethernet (vlan). 28 * Laptop therefore has to be registered with MedAuxtron IT. 29 * E.g. ethernet cable location, length, etc. 30 * >= 2m 31 * Ionisatoin chamnber: ROOS Chanmber from PTW 32 * CCTV monitoring for the set-up 46 * Laptop, therefore, has to be registered with MedAustron IT. 47 * Ethernet socket location, cable length, etc. 48 * Sockets on wall, so need cables >= 4m long. 49 * Ionisation chamber: 50 * ROOS Chanmber from PTW 51 * CCTV monitoring in the research room for the set-up 33 52 * Logistics: 34 53 * What arrangements do we need to make to set up for and to execute the experiemnt? 35 * 54 * If there are no shifts before the one we plan to use, then can gain access to room before the shift. 36 55 * Personal dosimetery for those involved. 37 * 56 * Dosimeters can be picked up when we arrive. 38 57 * Registration procedures etc. 39 * 40 * RP procedures; what is required before we take SmartPhantom away .41 * 58 * Need only flag in arrival with MP/SG in advance. 59 * RP procedures; what is required before we take SmartPhantom away? 60 * Leave to be measured then we can take it away if it is passed. 42 61 43 62 4. Summary, actions and next steps: All \\ 63 * See below. 44 64 45 65 ---- … … 57 77 If you want to join by phone, please use one of the phone numbers listed in the link below: \\ 58 78 http://information-technology.web.cern.ch/services/fe/howto/users-join-vidyo-meeting-phone 59 The PIN for the phone connection is: 1079548 *15026079 The PIN for the phone connection is: 1079548 60 80 }}} 61 81 … … 63 83 64 84 1. Outcomes from the morning discussions: HTL/LC/KL 85 * See above. 65 86 66 87 2. Discussion 88 * Points noted above. 67 89 68 90 If appropriate: routine agenda: … … 70 92 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/10-23 last meeting]: 71 93 * **KL**: Liaise to develop concept for polishing. 94 * **Stands.** 72 95 * **HTL**: Add CCAP note number to the header of the note and post it as a CCAP note. 96 * **Done.** 73 97 * **LC**: Complete detailed design of the boot. 98 * **Stands.** 74 99 * **KL:** Needs to confirm detail with M.Puchalska. 100 **Done.** 75 101 * **KL:** Look into Vidyo, ZOOM, or Skype for next week's meeting. 102 **Done.** 76 103 77 104 2. Mechanical design/manufacture update: LC \\ 105 * No update this week. 78 106 79 107 3. Single-fibre test setup: HTL \\ 108 * Mechanical model of source holder created. Need to agree final details and machine to spec. Also need to agree modifications to light-exclusion enclosure. 80 109 81 110 4. Schedule revision discussion: All \\ 111 * No update from last week. Criticl path is now the fibre procurement. 82 112 83 113 5. Spend: outstanding requirement: All \\ 84 114 [raw-attachment:SmartPhantom_Costing_301019.pdf Updated Costing] 115 * Now showing a £3k overspend. **KL** needs to sort this out; also charges from TD to PPD. 85 116 86 117 6. Next steps: All \\ 118 * Arrange transport of winding jig from RAL to IC. 119 * **Agreed** can't make Dec19 shifts. Aim to be ready for Jan20. 87 120 88 121 7. DONM \\ 122 * Next Wednesday. 89 123 90 124 8. AoB \\ 125 * None. 91 126 92 127 ----