Version 1 (modified by 5 years ago) ( diff ) | ,
---|
SmartPhantom meetings: Wednesday 6th November 2019
Meeting details
Videoconference using the Vidyo system.
Connection details:
Please join the VIDYO meeting by clicking this link: https://vidyoportal.cern.ch/join/SPJlsfAOEV
If you want to join by phone, please use one of the phone numbers listed in the link below:
http://information-technology.web.cern.ch/services/fe/howto/users-join-vidyo-meeting-phone
The PIN for the phone connection is: 1079548
Agenda:
- Notes and actions from last meeting:
- KL: Liaise to develop concept for polishing.
- Stands.
- LC: Complete detailed design of the boot.
- MP: Send autocad drawing of flask holder to LC.
- LC create drawing of station-holder concept: stations fixed to culture flask and station fixed at entry to water phantom.
- MP: Provide trigger-pulse shape.
- Done. MP provided the following specification:
- Trigger signal is a TTL (rectangular) standard; duration from 10 ns to 650 us.
- Done. MP provided the following specification:
- KL deal with projected overspend on IC IAA account and estimate of resource required from PPD.
- In progress. Need to discuss projected spend with LC. Money is now tight, but fortunately we've made most of the orders (I hope).
- KL: Liaise to develop concept for polishing.
- Mechanical design/manufacture update: LC
- Single-fibre test setup: HTL
- Schedule revision discussion: All
- Spend: outstanding requirement: All
- Next steps: All
- Arrange transport of winding jig from RAL to IC.
- DONM
- Next Wednesday.
- AoB
Attachments (1)
- 191106-SmartPhantom.pdf (591.3 KB ) - added by 5 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.