    v1 v2  
    88* Simulations.
    99* AOB
     10
     11== Actions ==
     12|| Actions      || Description  || Status
     13|| 22-12-06-04  || '''Chris Baker''' to provide a CAD model of the Gabor Lens test bench        ||  In progress
     14|| 22-12-06-05  || '''Clive Hill''' to import the CAD model into Creo to provide a better image of the Gabor Lenses.    ||  In progress
     15|| 23-01-17-02 || '''Ajit Kurup''' to get Dockerfiles for BDsim from Will.  || Closed
     16|| 23-01-17-03 || '''Ajit Kurup''' to investigate options for storing data somewhere easily accessible for the collaboration.  || In progress
     17|| 23-01-24-01 || '''All''' to prepare document for the milestone to update the baseline || In progress
     18
     19== Notes ==
     20Present:  Neil Bliss, Clive Hill, Ajit Kurup, Ken Long, Hywel Owen, Rehanah  Razak, Will Shields\\
     21Apologies: Jaroslaw Pasternak, Colin Whyte
     22       
     23
     24        * Document for the 6-month review.
     25                * NB is preparing a section on the facility layout and has written a first draft.
     26                * AK: Would it be useful to include some details on the plan to address sustainability?
     27                        * NB can add some details based on the work done for the CALA facility in Munich.
     28                        * Discussion.
     29                * WS is getting plots together for the document, text will follow.
     30                * Discussion on the different configurations to be mentioned in the report.
     31                * CAD
     32                        * NB has had discussions with Chris Baker and now has the CAD model of the lens.
     33                                * CW will upload a drawing of the SCAPA target area, which will be updated with details of the tape target.
     34                                * These can then be put together to present in the report.
     35                        * CH showed the CAD model.
     36                * AK: Will there be any input from the vacuum group at DL.
     37                        * NB: DL will wait for the CAD model to be ready before doing any calculations.
     38                        * NB: If there is time we could add a bit on the general vacuum design (i.e. how the design of the facility segregates the vacuum system into sections).
     39                * KL: Rehanah will use BDSIM to look at the delivery into the end stations to produce different spot sizes, micro-beams, etc.
     40                        * AK: Was looking into getting the BDSIM Docker image running.
     41                                * Discussion on how best to run BDSIM.
     42                                * Agreed using the version on CVMFS (available through the linux cluster)is simplest. Using Docker can be looked at in the future if there is a strong need for it.
     43                * NB to add more detail to the infrastructure section and Hywel will add to the Overleaf when it's ready.
     44                * Sections
     45                        * Infrastructure
     46                        * Design and simulations
     47                        * AK: Should we add a section on the RF? We can outline the key parameters and the technology choices being considered.
     48                                * Discussion.
     49                                * AK to outline current technology choices.
     50                        * AK to add subsection headings to document.