| 10 | |
| 11 | == Actions == |
| 12 | || Actions || Description || Status |
| 13 | || 22-12-06-04 || '''Chris Baker''' to provide a CAD model of the Gabor Lens test bench || In progress |
| 14 | || 22-12-06-05 || '''Clive Hill''' to import the CAD model into Creo to provide a better image of the Gabor Lenses. || In progress |
| 15 | || 23-01-17-02 || '''Ajit Kurup''' to get Dockerfiles for BDsim from Will. || Closed |
| 16 | || 23-01-17-03 || '''Ajit Kurup''' to investigate options for storing data somewhere easily accessible for the collaboration. || In progress |
| 17 | || 23-01-24-01 || '''All''' to prepare document for the milestone to update the baseline || In progress |
| 18 | |
| 19 | == Notes == |
| 20 | Present: Neil Bliss, Clive Hill, Ajit Kurup, Ken Long, Hywel Owen, Rehanah Razak, Will Shields\\ |
| 21 | Apologies: Jaroslaw Pasternak, Colin Whyte |
| 22 | |
| 23 | |
| 24 | * Document for the 6-month review. |
| 25 | * NB is preparing a section on the facility layout and has written a first draft. |
| 26 | * AK: Would it be useful to include some details on the plan to address sustainability? |
| 27 | * NB can add some details based on the work done for the CALA facility in Munich. |
| 28 | * Discussion. |
| 29 | * WS is getting plots together for the document, text will follow. |
| 30 | * Discussion on the different configurations to be mentioned in the report. |
| 31 | * CAD |
| 32 | * NB has had discussions with Chris Baker and now has the CAD model of the lens. |
| 33 | * CW will upload a drawing of the SCAPA target area, which will be updated with details of the tape target. |
| 34 | * These can then be put together to present in the report. |
| 35 | * CH showed the CAD model. |
| 36 | * AK: Will there be any input from the vacuum group at DL. |
| 37 | * NB: DL will wait for the CAD model to be ready before doing any calculations. |
| 38 | * NB: If there is time we could add a bit on the general vacuum design (i.e. how the design of the facility segregates the vacuum system into sections). |
| 39 | * KL: Rehanah will use BDSIM to look at the delivery into the end stations to produce different spot sizes, micro-beams, etc. |
| 40 | * AK: Was looking into getting the BDSIM Docker image running. |
| 41 | * Discussion on how best to run BDSIM. |
| 42 | * Agreed using the version on CVMFS (available through the linux cluster)is simplest. Using Docker can be looked at in the future if there is a strong need for it. |
| 43 | * NB to add more detail to the infrastructure section and Hywel will add to the Overleaf when it's ready. |
| 44 | * Sections |
| 45 | * Infrastructure |
| 46 | * Design and simulations |
| 47 | * AK: Should we add a section on the RF? We can outline the key parameters and the technology choices being considered. |
| 48 | * Discussion. |
| 49 | * AK to outline current technology choices. |
| 50 | * AK to add subsection headings to document. |