Design and Integration meeting: 04 April 2023 15:00 GMT
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Actions from last meeting.
- Simulations.
- Preparation of 6-month review document.
- AOB
Actions
Actions | Description | Status |
22-12-06-04 | Chris Baker to provide a CAD model of the Gabor Lens test bench | In progress |
22-12-06-05 | Clive Hill to import the CAD model into Creo to provide a better image of the Gabor Lenses. | In progress |
23-01-17-03 | Ajit Kurup to investigate options for storing data somewhere easily accessible for the collaboration. | Closed |
23-01-24-01 | All to prepare document for the milestone to update the baseline | In progress |
23-04-04-01 | Ajit to create directory structure for simulation files in sharepoint. | In progress |
Notes
Present: Neil Bliss, Clive Hill, Ajit Kurup, Hywel Owen, Jaroslaw Pasternak, Rehanah Razak, Will Shields
Apologies: Ken Long, Colin Whyte
- Review document.
- Final stages, will be merged tomorrow.
- CH showed latest CAD of the vacuum valve.
- HO: What are materials and are they compatible with being in a radiation environment?
- NB: should have options to choose different materials, so this shouldn't be a problem.
- HO: What are materials and are they compatible with being in a radiation environment?
- NB: Thinking about what components would be needed for the update to a 7 Gabor lens lattice.
- Slides from WS.
- Status update.
- IPAC paper submission deadline is 3rd May. Aim to have draft by 25th April.
- NB: Rough timeline for update to 7 gabor lens
- WS: Probably towards end of May.
- AK: Isn't the Stage 1 update dependent on parameters at injection, i.e. the FFA design?
- Discussion.
- HO: Are we going to use sharepoint for document storage.
- AK: Have tested uploading large files and it seems fine. Need to use the web interface if using Linux though.
- WS is happy with that.
- AK to set up detailed directory structure.
- AOB
- Meeting next week cancelled. Next meeting on 18/4/23.
Last modified
21 months ago
Last modified on Apr 11, 2023, 1:30:08 PM
Attachments (1)
- 20230404_WShields.pdf (1.9 MB ) - added by 21 months ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.