Changes between Version 2 and Version 3 of Research/LhARA/DesignAndIntegration/Meetings/2023/2023-08-08


Ignore:
Timestamp:
Aug 22, 2023 9:35:41 PM (8 months ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2023/2023-08-08

    v2 v3  
    99* Engineering.
    1010* AOB
     11== Actions ==
     12|| 23-01-24-01 || '''All''' to prepare document for the milestone to update the baseline || In progress
     13|| 23-07-25-01 || '''Neil, Clive, Colin''' Determine the thickness needed for the radiation shutter. || Closed
     14
     15== Notes ==
     16Present:  Neil Bliss,  Mark Johnson, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Lilli Platt, Rehanah  Razak,  Will Shields, Colin Whyte\\
     17Apologies: Clive Hill, Hywel Owen
     18
     19        * Actions
     20                * Update document.
     21                        * CW: In progress. Goal is to have this done by the September collab meeting. May not include dose.
     22                        * WS: Looking at dose calculation and should be able to include it.
     23                * Radiation.
     24                        * NB: Contractor engaged, will start in Nov. Can think about using temporary  wall instead of shutters but this does not provide the same flexibility.
     25                        * No need to keep this action.
     26        * Simulations
     27                * Slides from WS.
     28                        * Looking at the dose calculation done by HT Lau.
     29                * Slides from LP
     30                        * Looking at optimising the octupole in stage 1.
     31                        * Asymmetry in y is because the initial beam is asymmetric.
     32                        * JP: Should look at using two octupoles to improve uniformity in y.
     33                        * Discussion
     34                * Update from JP
     35                        * Investigating FD doublet. Vertical tune then becomes very high.
     36                        * Looking at FF doublet with very small second F.
     37        * NB: Update on engineering.
     38                * Vacuum modelling of the nozzle. Will have details to show next week.
     39                * FETS vacuum chamber.  First pass FEA is done.
     40                * Meeting scheduled to discuss target vessel in Strathclyde.
     41                * Looking at adding detail to power consumption.
     42                * Updated schematic.
     43                        * Shielding wall has now moved.
     44                        * Need to agree the other elements in the beam line that will take up space, e.g. profile monitors, wall current monitors, etc.
     45                * Details of the cavity?
     46                        * JP has looked at estimating the frequency of the first one.
     47        * AOB
     48                * KL: RR and KL working on simulation of the Lion beamline for proof of principle experiment. Will show some results soon.
     49                * JP:  Is there an update on the BDSim workshop date.
     50                        * Need a Doodle poll.
     51                * WS is design review and collab meeting on the same day?
     52                        * KL: Yes.
     53