Design and Integration meeting: 08 August 2023 15:00 GMT
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Actions from last meeting.
- Simulations.
- Engineering.
- AOB
Actions
23-01-24-01 | All to prepare document for the milestone to update the baseline | In progress |
23-07-25-01 | Neil, Clive, Colin Determine the thickness needed for the radiation shutter. | Closed |
Notes
Present: Neil Bliss, Mark Johnson, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Lilli Platt, Rehanah Razak, Will Shields, Colin Whyte
Apologies: Clive Hill, Hywel Owen
- Actions
- Update document.
- CW: In progress. Goal is to have this done by the September collab meeting. May not include dose.
- WS: Looking at dose calculation and should be able to include it.
- Radiation.
- NB: Contractor engaged, will start in Nov. Can think about using temporary wall instead of shutters but this does not provide the same flexibility.
- No need to keep this action.
- Update document.
- Simulations
- Slides from WS.
- Looking at the dose calculation done by HT Lau.
- Slides from LP
- Looking at optimising the octupole in stage 1.
- Asymmetry in y is because the initial beam is asymmetric.
- JP: Should look at using two octupoles to improve uniformity in y.
- Discussion
- Update from JP
- Investigating FD doublet. Vertical tune then becomes very high.
- Looking at FF doublet with very small second F.
- Slides from WS.
- NB: Update on engineering.
- Vacuum modelling of the nozzle. Will have details to show next week.
- FETS vacuum chamber. First pass FEA is done.
- Meeting scheduled to discuss target vessel in Strathclyde.
- Looking at adding detail to power consumption.
- Updated schematic.
- Shielding wall has now moved.
- Need to agree the other elements in the beam line that will take up space, e.g. profile monitors, wall current monitors, etc.
- Details of the cavity?
- JP has looked at estimating the frequency of the first one.
- AOB
- KL: RR and KL working on simulation of the Lion beamline for proof of principle experiment. Will show some results soon.
- JP: Is there an update on the BDSim workshop date.
- Need a Doodle poll.
- WS is design review and collab meeting on the same day?
- KL: Yes.
Last modified
15 months ago
Last modified on Aug 22, 2023, 9:35:41 PM
Attachments (3)
- Week 5 Presentation Lilli Platt.pptx (596.5 KB ) - added by 16 months ago.
- 20230808_WShields.pdf (1.9 MB ) - added by 16 months ago.
- 20230808_WShields.2.pdf (1.9 MB ) - added by 16 months ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.