Design and Integration meeting: 13 February 2024 15:00 GMT
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Simulations.
- Engineering.
- AOB
Actions
Notes
Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte
Apologies: Andy Goulden, Hywel Owen
- Simulation
- Slides from WS:
- Stage 1 optimisation. Now have a beam (with smaller beta and alpha close to 0) that can get through the injection line and match to the injection conditions.
- Gabor lens model in BDSim.
- Geometry details done.
- EM Field
- electric field only.
- Solenoid field is more complicated to implement.
- TJK: Will work on optimisation so that the field produced by the trim coils add to the field of the main coil.
- Looking at checking JB's code Fixed Field.
- Slides from JP:
- Including correctors and beam profile monitors in the injection line.
- Assumptions for the gap calculation.
- This will give the good field region needed and then can do the magnet simulation.
- Discussion on the gap size.
- TJK concerned about the dB/B requirement.
- Slides from WS:
- Engineering
- Template for the documents for milestones 6 and 7.
- Power requirements for the magnets.
- Discussion on power requirements for the FETS FFA magnet and comparison with LhARA.
- AOB
- KL: How is the JAI work is going?
- MP: Looking at the conceptual design of stage 1 beam delivery in the end station. Lattice design and spot sizes and looking at different magnet options. To be presented in about 5 weeks.
- KL: How is the JAI work is going?
Last modified
10 months ago
Last modified on Feb 20, 2024, 11:28:22 AM
Attachments (2)
- 20240213_WShields.pdf (2.0 MB ) - added by 10 months ago.
- Update_JPasternak13022024.pdf (249.9 KB ) - added by 10 months ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.