Design and Integration meeting: 13 February 2024 15:00 GMT

Zoom: https://ukri.zoom.us/j/99571436156

Agenda

  • Simulations.
  • Engineering.
  • AOB

Actions

Notes

Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte
Apologies: Andy Goulden, Hywel Owen

  • Simulation
    • Slides from WS:
      • Stage 1 optimisation. Now have a beam (with smaller beta and alpha close to 0) that can get through the injection line and match to the injection conditions.
      • Gabor lens model in BDSim.
        • Geometry details done.
        • EM Field
          • electric field only.
          • Solenoid field is more complicated to implement.
    • TJK: Will work on optimisation so that the field produced by the trim coils add to the field of the main coil.
      • Looking at checking JB's code Fixed Field.
    • Slides from JP:
      • Including correctors and beam profile monitors in the injection line.
      • Assumptions for the gap calculation.
        • This will give the good field region needed and then can do the magnet simulation.
      • Discussion on the gap size.
      • TJK concerned about the dB/B requirement.

  • Engineering
    • Template for the documents for milestones 6 and 7.
    • Power requirements for the magnets.
    • Discussion on power requirements for the FETS FFA magnet and comparison with LhARA.

  • AOB
    • KL: How is the JAI work is going?
      • MP: Looking at the conceptual design of stage 1 beam delivery in the end station. Lattice design and spot sizes and looking at different magnet options. To be presented in about 5 weeks.