  • Research/LhARA/DesignAndIntegration/Meetings/2024/2024-02-20

    v2 v3  
    2626                * Coil configuration and construction - TJK
    2727                * Update from MP:
    28                         * Prelim studies on the RF cavity after the nozzle
    29                         * Dipole and quad design in pr.
     28                        * Prelim studies on the RF cavity after the end station nozzle
     29                        * Dipole and quad design in progress.
    3030                       
    3131